Shimen power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Shimen power station (陕煤化长安石门发电厂) is an operating power station of at least 1200-megawatts (MW) in Chujiang Town, Shimen, Changde, Hunan, China with multiple units, some of which are not currently operating. It is also known as 大唐石门电厂 (Phase I Unit 1 & 2, Phase II Unit 3 & 4), 湖南石门2×660MW燃煤发电工程升级替代项目 (Phase III Unit 5 & 6), 陕煤石门电厂三期2×66万千瓦扩能升级改造项目 (Phase III Unit 5 & 6).
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Shimen power station | Chujiang Town, Shimen, Changde, Hunan, China | 29.625325, 111.310508 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Phase III Unit 5, Phase III Unit 6, Phase III Unit 7, Phase III Unit 8: 29.625325, 111.310508
- Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4: 29.5785546, 111.3940472
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Phase I Unit 1 | operating | coal: anthracite | 300 | subcritical | 1996 |
Phase I Unit 2 | operating | coal: anthracite | 300 | subcritical | 1996 |
Phase II Unit 3 | operating | coal: anthracite | 300 | subcritical | 2005 |
Phase II Unit 4 | operating | coal: anthracite | 300 | subcritical | 2006 |
Phase III Unit 5 | construction[1] | coal: anthracite | 660 | ultra-supercritical | – |
Phase III Unit 6 | construction[1] | coal: anthracite | 660 | ultra-supercritical | – |
Phase III Unit 7 | shelved | coal: anthracite | 660 | ultra-supercritical | – |
Phase III Unit 8 | shelved | coal: anthracite | 660 | ultra-supercritical | – |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Phase I Unit 1 | Changan Shimen Power Generation Co Ltd [100%] | Shaanxi Coal and Chemical Industry Co Ltd [53.7%]; China Huadian Group Corp [42.3%]; other [4.0%] |
Phase I Unit 2 | Changan Shimen Power Generation Co Ltd [100%] | Shaanxi Coal and Chemical Industry Co Ltd [53.7%]; China Huadian Group Corp [42.3%]; other [4.0%] |
Phase II Unit 3 | Changan Shimen Power Generation Co Ltd [100%] | Shaanxi Coal and Chemical Industry Co Ltd [53.7%]; China Huadian Group Corp [42.3%]; other [4.0%] |
Phase II Unit 4 | Changan Shimen Power Generation Co Ltd [100%] | Shaanxi Coal and Chemical Industry Co Ltd [53.7%]; China Huadian Group Corp [42.3%]; other [4.0%] |
Phase III Unit 5 | Shaanxi Coal Power Shimen Co Ltd [100%] | Shaanxi Coal and Chemical Industry Co Ltd [51.0%]; China Datang Corp [49.0%] |
Phase III Unit 6 | Shaanxi Coal Power Shimen Co Ltd [100%] | Shaanxi Coal and Chemical Industry Co Ltd [51.0%]; China Datang Corp [49.0%] |
Phase III Unit 7 | Shaanxi Coal Power Shimen Co Ltd [100%] | Shaanxi Coal and Chemical Industry Co Ltd [51.0%]; China Datang Corp [49.0%] |
Phase III Unit 8 | Shaanxi Coal Power Shimen Co Ltd [100%] | Shaanxi Coal and Chemical Industry Co Ltd [51.0%]; China Datang Corp [49.0%] |
Location of plant
The map below shows the location of the plant in Shimen County.
Location of expansion
The map below shows the proposed location for the expansion in Shimen County.
Background
Shimen power station is a four-unit coal-fired power plant with a total capacity of 1,200 MW. The plant was completed between 1996 and 2006. The plant is owned by Shaanxi Coal and Chemical Industry Group (54%), China Datang (42%), Hunan Detai Coal Industry Company (4%).[2][3][4]
Expansion
In July 2019, it was reported that a 4 x 660 MW expansion at the power station was planned and included in the "14th Five-Year Plan for the Electric Power Development" of Hunan Province (2021-2025). It was planned for operation in 2023.[5]
In October 2022, various news referenced a 2 x 660 MW expansion and upgrading project was started.[6][7][8]
By March 2023, the "third phase" (no capacity listed) had reportedly completed land clearing, green pressing, and enclosure work.[9]
By June 2023, preliminary design expert review meeting was held for 2 x 660 MW.[10]
The designated railway line for 2 x 660 MW units was permitted in March 2022.[11]
With no known updates in at least two years, two of the four units of the project were presumed shelved in 2023.
Articles and Resources
References
- ↑ 1.0 1.1 https://web.archive.org/web/20240207001524/https://mp.weixin.qq.com/s/QWceOSbYTuWQ2hicngXLyw. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ Huadian Shimen Powerplant, Enipedia, accessed Sept. 2015.
- ↑ "大唐石门发电公司简介," Shaanxi Coal and Chemical Industry Group, 2013-03-11
- ↑ "陕煤化集团长安石门发电有限公司," Shaanxi Coal and Chemical Industry Group, 2016-10-18
- ↑ "2×1000MW+4×660MW!两个大型火电项目获湖南省能源局“路条”," 北极星电力网新闻中心, 2019/7/29
- ↑ 陕煤石门2×66万千瓦扩能升级改造项目开工, hn.chinanews.com, October 1, 2022
- ↑ 常德市: 陕煤石门2×66万千瓦扩能升级项目开工, 2022-10-02
- ↑ 总投资57.15亿元!陕煤石门2×660MW扩能升级改造项目开工, BJX, 2022-10-08
- ↑ 吴兴国专题调研陕煤石门电厂三期建设工作, smrmnews, 2023-03-04
- ↑ 陕煤石门2×66万千瓦扩能升级改造项目最新进展!, BJX, 2023-06-09
- ↑ 关于陕煤石门2×660MW燃煤发电工程升级替代项目铁路专用线工程核准的批复, fgw.hunan.gov.cn, March 24, 2022