Shiyan Cogen power station (京能十堰热电) is an operating power station of at least 1050-megawatts (MW) in Shiqiao Village, Zhangwan District, Shiyan, Hubei, China.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Shiyan Cogen power station Shiqiao Village, Zhangwan District, Shiyan, Hubei, China 32.683566, 110.737906 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2, Unit 3: 32.683566, 110.737906

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Unit 1 operating coal: unknown 350 supercritical 2018
Unit 2 operating coal: unknown 350 supercritical 2019
Unit 3 operating[1] coal: unknown 350 supercritical 2024[2][1]

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Beijing To Shiyan Thermal Power Co Ltd [100%] Beijing Jingneng Power Co Ltd [60.0%]; Beijing State-owned Capital Management Center [40.0%]
Unit 2 Beijing To Shiyan Thermal Power Co Ltd [100%] Beijing Jingneng Power Co Ltd [60.0%]; Beijing State-owned Capital Management Center [40.0%]
Unit 3 Beijing To Shiyan Thermal Power Co Ltd [100%] Beijing Jingneng Power Co Ltd [60.0%]; Beijing State-owned Capital Management Center [40.0%]

Project-level coal details

  • Permit(s): 鄂发改审批服务〔2021〕145号[3]

Background on Project

Beijing Energy Group is building a 2 x 350 MW supercritical coal plant in Shiqiao Village, Zhangwan District. The project was permitted in December 2014. It is planned for operation in 2017.[4][5]

July 2017: Plant postponed by government

In July 2017 China's National Energy Administration (NEA) released the "Guideline of Supply-Side Reform of the Coal Power Bubble". The Guideline included a draft list which slowed down or halted 185 coal-burning units across 21 provinces, totaling 107 GW. 114 coal units (65 GW) are ordered to slow down the construction progress during 2017 to 2020, and are not allowed to connect to the grid in 2017. In addition, 71 coal units (42 GW) were halted indefinitely for regulation violations. The list partly overlapped with the projects listed in the January NEA letter to 13 provinces.[6]

Shiyan Cogen power station Units 1-2 are among the postponed coal-burning units,[6] and also appeared on an updated list of postponed projects released in September 2017.[7]

For more information, see China's 2016/2017 Restrictions on Development of Coal-Fired Power Capacity.

2018: Construction continues

A November 2017 articles states that construction is ongoing at the power station, which is planned for operation in 2018.[8]

Unit 1 was commissioned in December 2018.[9]

Unit 2 was commissioned in March 2019.[10]

Expansion

A second phase of 1 x 350MW (Unit 3) has been listed in the Hubei Provincial Coal Power Development Plan.[11]

The proposed unit received a permit for construction on June 28, 2021.[12]

Construction reportedly began in November 2021.[13] However, as of June 2022, there was still no indication of construction from Planet satellite imagery. In August 2022, construction was reported (again) to have begun.[14] At the time, the project was estimate to be complete and operating by the end of 2023.[14]

Articles and Resources

References

  1. 1.0 1.1 https://web.archive.org/web/20240423173321/https://news.bjx.com.cn/html/20240207/1360881.shtml. Archived from the original on 23 April 2024. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20240125083605/https://mp.weixin.qq.com/s/bZGTrA55voDx27walKGo8Q. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. https://fgw.hubei.gov.cn/fbjd/xxgkml/xkfw/xzxkjg/xmhzqk/202107/t20210713_3756885.shtml. {{cite web}}: Missing or empty |title= (help)
  4. "全省瞩目的京能十堰热电联产项目正式开工," 十堰市发改委 发布日期, 2015-03-03
  5. "京能十堰热电联产项目获核准," 十堰热电, 2014年12月16日
  6. 6.0 6.1 "16部委联合发文防范化解煤电产能过剩风险," Sohu.com, 2017-08-03
  7. "2017年分省煤电停建和缓建项目名单," Sohu, 2017-10-12
  8. "京能十堰热电联产项目总投资过半: 明年冬季开始为城区供暖," Shiyan government, Nov 17, 2017
  9. [http://www.10yan.com/2018/1222/597875.shtml "京能十堰热电项目启动全面供暖 张维国宣布试运行圆满成功 陈新武罗元红王永亮等共同见证,"] 秦楚网, 2018-12-22
  10. "湖北工程公司京能热电联产工程2号机组一次性通过168小时试运行," 湖北工程公司, 2019-03-14
  11. "十堰热电二期扩建项目纳规有关情况的公示," 北极星电力网新闻中心, 2021/6/2
  12. "京能十堰热电联产二期工程3号机组项目获得核准," 北极星电力网新闻中心, 2021/7/20
  13. "154个项目 总投资315.8亿元," 胡亚波宣布开工 黄剑雄主持活动, 2021-11-05
  14. 14.0 14.1 京能十堰二期热电联产项目开工 BJX, 2022-08-08

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.