Shostkinska power station (Шосткінська ТЕЦ, Шосткинская ТЭЦ (Russian)) is an operating power station of at least 114-megawatts (MW) in Shostka, Sumy Oblast, Ukraine. It is also known as Svema plant.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Shostkinska power station Shostka, Sumy Oblast, Ukraine 51.8827585, 33.4603094 (approximate)[1]

The map below shows the approximate location of the power station.

Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year
1 Operating[2][3][4] fossil gas: natural gas[4] 57[5][4] steam turbine[5] yes[4] 1962[6]
2 Operating[2][3][4] fossil gas: natural gas[7] 57[5][4] steam turbine[8] yes[7] 1962[9]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
1 Shp Kharkivenerhoremont LLC [100%][6][9] Shp Kharkivenerhoremont LLC [100.0%]
2 Shp Kharkivenerhoremont LLC [100%][6][9] Shp Kharkivenerhoremont LLC [100.0%]

Background

In October 2023, the Economic Court of Sumy Oblast initiated bankruptcy proceedings against Shp Kharkivenerhoremont LLC, a long-term lessee of the Shostkinska power station. The company's founders listed in the state register are Shostkaenergo-T LLC (75%), with the ultimate beneficial owner and founder being Vasiliy Momot, and Municipal Enterprise "Production Management of Water Supply and Sewerage Economy" (25%). The company was founded in June 2006, and its primary activity is power generation. In March 2021, Kharkivenerhoremont requested the city council to terminate the lease agreement for the power plant prematurely, which was originally valid until 2026. According to one of the shareholders of Kharkivenerhoremont, the enterprise was consistently operating at a loss. The gas debt in Shostka for the enterprise increased by 100 million UAH in 2021 alone. The debtors will owe money to Kharkivenerhoremont until the enterprise is liquidated, however, the company will be dissolved when all debts are collected, which implies that this process could take decades.[10]

Media reports indicated that the power station may have been targeted by a Russian missile attack in May 2024. However, there have been no reports on whether the station sustained any damage.[11]

Articles and Resources

References

  1. https://goo.gl/maps/SQJCR6UjtgY7XSYU7?coh=178573&entry=tt. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20240516231702/https://matsam.livejournal.com/tag/%25D0%25A3%25D0%25BA%25D1%2580%25D0%25B0%25D0%25B8%25D0%25BD%25D0%25B0. Archived from the original on 16 May 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://biz.liga.net/all/tek/novosti/sud-nachal-bankrotstvo-arendatora-shostkinskoy-tets. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 (PDF) https://web.archive.org/web/20230112214051/https://www.kmu.gov.ua/storage/app/sites/1/recoveryrada/ua/energy-security.pdf. Archived from the original (PDF) on 12 January 2023. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 https://web.archive.org/web/20230502232408/http://petrocity.ru/modernization/. Archived from the original on 02 May 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  6. 6.0 6.1 6.2 (PDF) https://faolex.fao.org/docs/pdf/ukr171314.pdf. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 https://www.kmu.gov.ua/storage/app/sites/1/recoveryrada/ua/energy-security.pdff. {{cite web}}: Missing or empty |title= (help)
  8. https://web.archive.org/web/20230502232408/http://petrocity.ru/modernization/. Archived from the original on 02 May 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  9. 9.0 9.1 9.2 https://faolex.fao.org/docs/pdf/ukr171314.pdff. {{cite web}}: Missing or empty |title= (help)
  10. "Суд начал банкротство арендатора Шосткинской ТЭЦ". biz.liga.net. October 6, 2023. Retrieved December 20, 2023.{{cite web}}: CS1 maint: url-status (link)
  11. "Утреннее". matsam.livejournal.com. May 6, 2024. Retrieved May 14, 2024.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.