Shuaibah 2 solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Shuaibah 2 solar farm (محطة الشعيبة ٢ للطاقة الشمسية) is a solar photovoltaic (PV) farm in pre-construction in Al-Qassim Province, Saudi Arabia.
Project Details
Table 1: Phase-level project details for Shuaibah 2 solar farm
Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
Pre-construction[1] | 2025 (planned)[2] | 2030 MWp/dc[3] | PV[4] | Saudi Aramco Power Co [30%]; ACWA Power Co [35%]; Water and Electricity Holding CO (Badeel) [34%][5] | ACWA Power[6] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Shuaibah 2 solar farm
Location | Coordinates (WGS 84) |
---|---|
Al-Qassim Province, Saudi Arabia[7] | 25.6243, 42.3528 (approximate)[7] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ https://www.saudigulfprojects.com/2023/08/2-6gw-al-shuaibah-1-and-al-shuaibah-2-solar-pv-projects-reaches-financial-close/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://acwapower.com/media/342173/acwa-power-1q-2024-investor-report-eng_v9plusfs.pdf https://makkahnewspaper.com/article/1577968/%D8%A3%D8%B9%D9%85%D8%A7%D9%84/%D8%A8%D8%AF%D9%8A%D9%84-%D9%88%D8%A3%D9%83%D9%88%D8%A7-%D8%A8%D8%A7%D9%88%D8%B1-%D8%AA%D9%86%D8%B4%D8%A6%D8%A7%D9%86-%D9%81%D9%8A-%D8%A7%D9%84%D8%B4%D8%B9%D9%8A%D8%A8%D8%A9-%D8%A3%D9%83%D8%A8%D8%B1-%D9%85%D8%AD%D8%B7%D8%A9-%D8%B7%D8%A7%D9%82%D8%A9-%D8%B4%D9%85%D8%B3%D9%8A%D8%A9-%D8%A8%D8%A7%D9%84%D8%B4%D8%B1%D9%82-%D8%A7%D9%84%D8%A3%D9%88%D8%B3%D8%B7-%D9%88%D8%B4%D9%85%D8%A7%D9%84-%D8%A3%D9%81%D8%B1%D9%8A%D9%82%D9%8A%D8%A7, https://acwapower.com/media/342173/acwa-power-1q-2024-investor-report-eng_v9plusfs.pdf.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ https://acwapower.com/en/projects/shuaibah-pv-ipp/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240308211434/https://www.arabnews.com/node/2104666/business-economy. Archived from the original on 2024-03-08.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://acwapower.com/en/projects/shuaibah-pv-ipp/, https://www.saudigulfprojects.com/2023/08/2-6gw-al-shuaibah-1-and-al-shuaibah-2-solar-pv-projects-reaches-financial-close/, https://www.saudigulfprojects.com/2023/08/2-6gw-al-shuaibah-1-and-al-shuaibah-2-solar-pv-projects-reaches-financial-close/ https://www.saudigulfprojects.com/2023/08/2-6gw-al-shuaibah-1-and-al-shuaibah-2-solar-pv-projects-reaches-financial-close/, https://acwapower.com/en/projects/shuaibah-pv-ipp/, https://www.saudigulfprojects.com/2023/08/2-6gw-al-shuaibah-1-and-al-shuaibah-2-solar-pv-projects-reaches-financial-close/, https://www.saudigulfprojects.com/2023/08/2-6gw-al-shuaibah-1-and-al-shuaibah-2-solar-pv-projects-reaches-financial-close/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240201140014/https://makkahnewspaper.com/article/1577968/%D8%A3%D8%B9%D9%85%D8%A7%D9%84/%D8%A8%D8%AF%D9%8A%D9%84-%D9%88%D8%A3%D9%83%D9%88%D8%A7-%D8%A8%D8%A7%D9%88%D8%B1-%D8%AA%D9%86%D8%B4%D8%A6%D8%A7%D9%86-%D9%81%D9%8A-%D8%A7%D9%84%D8%B4%D8%B9%D9%8A%D8%A8%D8%A9-%D8%A3%D9%83%D8%A8%D8%B1-%D9%85%D8%AD%D8%B7%D8%A9-%D8%B7%D8%A7%D9%82%D8%A9-%D8%B4%D9%85%D8%B3%D9%8A%D8%A9-%D8%A8%D8%A7%D9%84%D8%B4%D8%B1%D9%82-%D8%A7%D9%84%D8%A3%D9%88%D8%B3%D8%B7-%D9%88%D8%B4%D9%85%D8%A7%D9%84-%D8%A3%D9%81%D8%B1%D9%8A%D9%82%D9%8A%D8%A7. Archived from the original on 2024-02-01.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 https://web.archive.org/web/20240206221716/https://www.dmsprojects.net/saudi-arabia/projects/repdo-pif-al-faisaliah-600-mw-solar-pv-plant/PRJ00025968. Archived from the original on 2024-02-06.
{{cite web}}
: Missing or empty|title=
(help)