Shubarkol Premium Coal Mine
This article is part of the Global Coal Mine Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Related-articles: |
Shubarkol Premium Coal Mine (Шубарколь Премиум) is an operating coal mine in Shubarkol, Nura district, Karaganda, Kazakhstan.
Location
Table 1: Project-level location details
Mine Name | Location | Coordinates (WGS 84) |
---|---|---|
Shubarkol Premium Coal Mine | Shubarkol, Nura district, Karaganda, Kazakhstan | 49.017346, 68.614549 (approximate) |
The map below shows the approximate location of the coal mine:
Project Details
Table 2: Project status
Status | Status Detail | Opening Year | Closing Year |
---|---|---|---|
Operating | – | 2016 | – |
Table 3: Operation details
Capacity (Mtpa) | Production (Mtpa) | Year of Production | Mine Type | Mining Method | Mine Size (km2) | Mine Depth (m) | Workforce Size |
---|---|---|---|---|---|---|---|
– | 3[1] | 2022[1] | Surface | Open Pit | – | 50* | 861* |
Table 4: Coal resources and destination
Total Reserves (Mt) | Year of Total Reserves Recorded | Total Resources (Mt) | Coalfield | Coal Type | Coal Grade | Primary Consumer/ Destination |
---|---|---|---|---|---|---|
399 | – | 2147 | – | Subbituminous | Thermal | – |
Table 5: Ownership and parent company
Owner | Parent Company | Headquarters |
---|---|---|
Shubarkol Premium JSC | Shubarkol Premium JSC [100%] | Kazakhstan |
Table 6: Historical production (unit: million tonnes per annum)
ROM or Saleable | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 |
---|---|---|---|---|---|---|---|
Saleable | 3[2] | – | 1*[3] | 1[1] | 1[1] | 3[1] | 1*[4] |
Expansion/Extension
Table 6: Project status
Status | Status Detail | Project Type | Project Phase | Added Capacity (Mtpa)* | Start Year |
---|---|---|---|---|---|
Proposed | Announced | Expansion | – | 1[1] | 2023 |
Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September supplement.
Background
Shurbarkol Premium Coal Mine (разрез Шубарколь Премиум) is a SURFACE mine in Karaganda region, Kazakhstan.
It is not to be confused with Shubarkol Centralny coal mine and Shubarkol Zapadny Coal Mine. Shubarkol Premium JSC owns and operates the mine. The company is listed on the Kazakhstan Stock Exchange.[5]
It is owned by Joint Resources JSC (67%), TRANS COAL INVESTMENT GROUP LLP (16.5%) and FCI MANAGEMENT LLP (16.5%).[5] Mr T. Kulibaev is the sole shareholder of Joint Resources JSC.[6]
Shubarkol Premium JSC was registered in April 2017. Initially, the development of the coal mine was carried out by JV Arbat LLP, established in 2013 to implement the project to develop the Centralny-2 site of Shubarkol coal deposit in the Karaganda region. In 2013 the company signed a contract with the Ministry of Energy of Kazakhstan for coal extraction for 25 years, the contract is renewable.[7] In 2016, Arbat JV was renamed to Shubarkol Premium.[8]
The mine produces Grade D coal (sub-bituminous), with further processing and production of semi-coke, coal-tar, semi-coking gas, synthetic liquid fuel. Coal is supplied to the domestic market as well as exported.[8]
Coal production almost doubled in 2022 and according to the company's annual report, in 2023 it planned to increase production to 4.2 Mt.[9] However as of September 2023, the coal mine's production only reached over 1 million tonnes, a 50% decrease compared to 2022, due to limitations on the supply of railway cars by the national company Kazakhstan Temir Zholy. Most of the coal in January-August 2023 was exported to Poland (8x increase compared with 2022 export levels), the rest was shipped to Latvia, Estonia and Uzbekistan. In contrast in the same period in 2022, significant volumes were shipped to Tukey, Cyprus and Switzerland.[10] 2023 production plan has been revised to 2 million tonnes.[10]
- Owner: Shubarkol Premium JSC
- Parent: Joint Resources JSC [67.0%]; TOO FCI Management [16.5%]; TOO Trans Coal Investment Group [16.5%]
- Location: Nura district, Karaganda region, Kazakhstan
- Coordinates: 49.017346, 68.614549 (Approximate)
- Status: Operating
- Production: 1.14 million tonnes (2020), 1.68 million tonnes (2021)[11], 3 million tonnes (2022)[9]
- Total Resource: 2147 million tonnes[8]
- Total Reserves: 399 million tonnes (2021)[11]
- Coal Type: SUBBITUMINOUS (Thermal)
- Mine Type: SURFACE
- Start Year: 2016
- Source of Financing:
Articles and Resources
Additional data
To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 (PDF) https://kase.kz/files/emitters/SHUP/shupp_2022_rus.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20201029064006/https://shubarkolpremium.kz/about.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://kase.kz/files/emitters/SHUP/shupp_2020_rus.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://agmpnews.kz/kompaniya-timura-kulibaeva-vinit-v-sokrashhenii-dobychi-i-eksporta-uglya-ktzh/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 "Shubarkol Premium JSC (SHUP)". kase.kz. Retrieved February 2023.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "2022 Audit Report Shubarkol Komir" (PDF). /kase.kz/. 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Shubarkol Premium 2021 Financial Statements" (PDF). kase.kz. 2022.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 8.0 8.1 8.2 "Shubarkol Premium - About Us". shubarkolpremium.kz. Retrieved February 2023.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ 9.0 9.1 "Shubarkol Premium Annual Report 2022" (PDF). kase.kz. 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 10.0 10.1 "Компания Тимура Кулибаева винит в сокращении добычи и экспорта угля КТЖ". kz.kursiv.media. September 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 11.0 11.1 Cite error: Invalid
<ref>
tag; no text was provided for refs named:2