Shuozhou cogen power station (晋能控股朔州热电) is an operating power station of at least 700-megawatts (MW) in Yaozitou Xiang Qianzhai village, Shuocheng District, Shuozhou, Shanxi, China. It is also known as Tongmei Shuonan Gangue power station, 同煤朔南低热值煤热电厂一期.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Shuozhou cogen power station | Yaozitou Xiang Qianzhai village, Shuocheng District, Shuozhou, Shanxi, China | 39.215859, 112.388698 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2: 39.215859, 112.388698
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Unit 1 | operating | coal: waste coal | 350 | supercritical | 2019 |
Unit 2 | operating | coal: waste coal | 350 | supercritical | 2020 |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 1 | Datong Shuozhou Thermal Power Group Co Ltd [100%] | Shanxi State-Owned Capital Investment and Operation Co Ltd [58.7%]; China Cinda Asset Management Co Ltd [30.1%]; Jinneng Holding Group Co Ltd [6.5%]; other [4.7%] |
Unit 2 | Datong Shuozhou Thermal Power Group Co Ltd [100%] | Shanxi State-Owned Capital Investment and Operation Co Ltd [58.7%]; China Cinda Asset Management Co Ltd [30.1%]; Jinneng Holding Group Co Ltd [6.5%]; other [4.7%] |
Background on Project
Datong Coal Mining Group is currently planning to build a waste coal-fired power plant with a total planned capacity of 700 MW in Shanxi Province.[1]
The power station is under construction and planned for operation in 2017.[2]
July 2017: Plant postponed by government
In July 2017 China's NEA released the "Guideline of Supply-Side Reform of the Coal Power Bubble". The Guideline included a draft list which slowed down or halted 185 coal-burning units across 21 provinces, totaling 107 GW. 114 coal units (65 GW) are ordered to slow down the construction progress during 2017 to 2020, and are not allowed to connect to the grid in 2017. In addition, 71 coal units (42 GW) were halted indefinitely for regulation violations. The list partly overlapped with the projects listed in the January NEA letter to 13 provinces.[3]
Shuozhou cogen power station Units 1-2 are among the postponed coal-burning units,[3] and also appeared on an updated list of postponed projects released in September 2017.[4]
For more information, see China's 2016/2017 Restrictions on Development of Coal-Fired Power Capacity.
September 2017: Project substantially completed
Satellite photos from Google Earth (3/18) and Planet (9/17) show that the project is substantially completed, though apparently not operating.
2019-2020: Plant commissioned
Unit 1 was commissioned on December 6, 2019.[5] Unit 2 was commissioned on January 17, 2020.[6]
Articles and Resources
References
- ↑ "山西首定五个低热值煤发电项目", 人民网中国能源报, 2013-11-18
- ↑ "同煤集团朔南热电项目开工," 山西晚报(太原), 2015-07-05
- ↑ 3.0 3.1 "16部委联合发文防范化解煤电产能过剩风险," Sohu.com, 2017-08-03
- ↑ "2017年分省煤电停建和缓建项目名单," Sohu, 2017-10-12
- ↑ "同煤朔州热电2×350兆瓦超临界低热值煤1号机组投产," 山西电建, 2019/12/9
- ↑ "2×350MW!同煤集团朔州热电厂工程双投," 规划设计集团, 2020/1/21
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.