Sinopec Longkou LNG Terminal

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Sinopec Longkou LNG Terminal (中石化龙口LNG接收站) is an LNG terminal under construction in Longkou, Yantai, Shandong, China.

Location

Loading map...
中石化龙口LNG接收站一期二期效果图.png

Project details

Phase I

  • Owner: Sinopec Yantai Longkou LNG Co., Ltd. 中石化烟台龙口液化天然气有限公司[1]
  • Parent company: China Petrochemical Corporation 50%, Shandong Getai Investment Co., Ltd. 30%, Yantai Port Co., Ltd. 20%.
中国石油化工股份有限公司 50%
山东格泰投资有限公司 30%
烟台港股份有限公司 20%
  • Location: Longkou, Yantai, Shandong, China
  • Coordinates: 37.64973979560849, 120.29077590329354 (exact)
  • Capacity: 6.5 mtpa[2]
  • Status: Construction[2]
  • Type: Import
  • Start year: 2023[2]

Phase 2

  • Owner: Sinopec Yantai Longkou LNG Co., Ltd. 中石化烟台龙口液化天然气有限公司[1]
  • Parent company: China Petrochemical Corporation 50%, Shandong Getai Investment Co., Ltd. 30%, Yantai Port Co., Ltd. 20%.
中国石油化工股份有限公司

China Petrochemical Corporation

50%
山东格泰投资有限公司

Shandong Getai Investment Co., Ltd.

30%
烟台港股份有限公司

Yantai Port Co., Ltd.

20%
  • Location: Longkou, Yantai, Shandong, China
  • Coordinates: 37.64973979560849, 120.29077590329354 (exact)
  • Capacity: 5.5 mtpa[3]
  • Status: Proposed
  • Type: Import
  • Start year:

Background

In January 2019 an agreement to build the terminal was signed by Deputy Secretary of the Longkou Municipal Party Committee and Langkou Mayor Lu Bo, Sinopec, the Longkou Port Group, and Hengtong Logistics.[4]

The project received permit for construction in September 2021.[5]

Construction on the first phase began in December 2021.[2][6] The operating was expected in 2023.[6]

As of December 2022, the first phase is making progress on construction.[7]

The second phase of Sinopec Longkou LNG Terminal was brought out for public review on environmental impact in October 2021,[8] and on social security impact in May 2022. [9] The second phase will add 6 storage tanks. Two of them are 270,000 cubic meters of capacity and four are 220,000 cubic meters. [8] According to the framework agreement between Sinopec and Longlou local government in 2019, after the second phase the total receiving capacity will reach 20 mtpa.[10] But later source indicates that after the second phase the total receiving capacity will reach 12 mtpa. Considering the storage capacity and the total investment, 12 mtpa is more reasonable.[3]

As of November 2023, the construction of the first phase is still ongoing.[11]

Articles and resources

References

  1. 1.0 1.1 "中石化烟台龙口液化天然气有限公司". www.qcc.com.{{cite web}}: CS1 maint: url-status (link)
  2. 2.0 2.1 2.2 2.3 "中石化龙口LNG项目开工 一期接转能力每年650万吨_中证网". www.cs.com.cn. Retrieved 2022-06-27.
  3. 3.0 3.1 "中石化龙口LNG项目开工 一期接转能力每年650万吨 来源:上海证券报·中国证券网 作者:陈其珏". https://news.cnstock.com/. 2021-12-01. {{cite web}}: External link in |website= (help); line feed character in |title= at position 27 (help)CS1 maint: url-status (link)
  4. 中石化龙口年接卸力2600万吨LNG接收站项目签约, www.in-en.com, Jan. 17, 2019
  5. "【关于中国石化龙口液化天然气接收站项目核准的批复(发改能源〔2021〕1373号)】-国家发展和改革委员会". www.ndrc.gov.cn. 2021-09-21.{{cite web}}: CS1 maint: url-status (link)
  6. 6.0 6.1 "中国石化龙口液化天然气项目开工 一期工程预计2023年建成投产-中国科技网". www.stdaily.com. 2021-12-01.{{cite web}}: CS1 maint: url-status (link)
  7. "【项目】中石化龙口LNG项目圆满完成两大节点目标_来源:LNG接收站建造师". www.sohu.com. 2022-12-13.{{cite web}}: CS1 maint: url-status (link)
  8. 8.0 8.1 "总投资超83亿元 国家发改委同意建设中石化龙口项目!二期工程环评公示_液化". www.sohu.com. 2021-10-15.{{cite web}}: CS1 maint: url-status (link)
  9. "龙口市政府 通知公告 中国石化龙口液化天然气(LNG)项目二期工程社会稳定风险评估公众参与信息公示". www.longkou.gov.cn (in 中文(中国大陆)). 2022- 05- 25. {{cite web}}: Check date values in: |date= (help)CS1 maint: url-status (link)
  10. 中石化龙口年接卸力2600万吨LNG接收站项目签约 Source:今日龙口, 2019-01-18
  11. "山东烟台: LNG接收站工程建设进展顺利". paper.people.com.cn. 2023-11-27.{{cite web}}: CS1 maint: url-status (link)