Sir Adam Beck 1 hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Sir Adam Beck 1 hydroelectric plant is an operating hydroelectric power plant in Niagara Region, Golden Horseshoe, Ontario, Canada.
Project Details
Table 1: Project details for Sir Adam Beck 1 hydroelectric plant
Status | Commissioning year | Nameplate capacity | Turbines | Technology type | Owner |
---|---|---|---|---|---|
Operating[1] | 1921[1] | 446 MW[1] | 10[1] | Conventional storage[2] | Ontario Power Generation Inc [100%][1] |
Location
Table 2: Location details for Sir Adam Beck 1 hydroelectric plant
Location | River | Complex | Coordinates (WGS 84) |
---|---|---|---|
Niagara Region, Golden Horseshoe, Ontario, Canada[3][4] | Niagara River[5] | Sir Adam Beck Complex[2] | 43.1489, -79.0444 (exact)[3][4] |
The map below shows the exact location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20221006162110/http://www.opg.com/powering-ontario/our-generation/hydro/. Archived from the original on 2022-10-06.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 https://web.archive.org/web/20230111113813/https://www.power-technology.com/projects/sir-adam-beck-hydroelectric-power-complex-niagara-falls/. Archived from the original on 2023-01-11.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://goo.gl/maps/r1Xj1hVm6CcHw2oY8.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 https://database.earth/energy/power-plant/sir-adam-beck-1.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "Our power generation". OPG. Archived from the original on 2025-01-07. Retrieved 2024-12-20.
{{cite web}}
: Text "Hydroelectric power" ignored (help)