Siroka Draga wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Siroka Draga wind farm (Široka Draga) is a wind farm under construction in Kamešnica, Bosnia and Herzegovina.
Project Details
Table 1: Phase-level project details for Siroka Draga wind farm
Status | Commissioning year | Nameplate capacity | Type | Owner |
---|---|---|---|---|
Construction[1] | 2026 (planned)[2] | 125 MW[1] | Onshore[1] | Imres Smart Greenergy; Enprode[3] |
Location
Table 2: Phase-level location details for Siroka Draga wind farm
Location | Coordinates (WGS 84) |
---|---|
Kamešnica, Bosnia and Herzegovina[1] | 43.7227, 16.8692 (approximate)[1] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20240125210221/https://sarajevotimes.com/the-construction-of-another-wind-farm-in-bosnia-is-underway/. Archived from the original on 2024-01-25.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "All set for construction of 125.4 MW wind park Široka draga in BiH". Balkan Green Energy News. 2024-08-13. Archived from the original on 2024-12-18. Retrieved 2024-12-16.
- ↑ https://serbia-energy.eu/bosnia-and-herzegovina-siroka-draga-wind-project-obtained-energy-permit/ https://serbia-energy.eu/bosnia-and-herzegovina-siroka-draga-wind-project-obtained-energy-permit/, https://serbia-energy.eu/bosnia-and-herzegovina-siroka-draga-wind-project-obtained-energy-permit/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help)