Skoczów-Komorowice-Oświęcim Gas Pipeline
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Skoczów-Komorowice-Oświęcim Gas Pipeline is a proposed gas pipeline in Poland.[1]
Location
The pipeline would run through the municipalities of Skoczów, Jasienica, Bielsko-Biała, Bestwina, Wilamowice, Kęty, and Oświęcim.[1][2]
Pipeline Details
- Operator: Gaz-System[2]
- Owner: Gaz-System[2]
- Parent: Gaz-System[2]
- Proposed Capacity:
- Length: 53 km / 33 miles[3]
- Diameter: 500 mm / 20 inches[2]
- Cost: €32 million (US$36.48 million)[4]
- Status: Proposed
- Start Year: 2021
Background
A positive environmental impact assessment (EIA) was issued for the pipeline in February 2015.[1] As of 2018, the pipeline was in the design phase.[5]
In 2019, Gaz-System anticipated obtaining a building permit in 2021.[6]
On April 27, 2021, plans relating to the location of the pipeline were approved by the Polish government.[7]
As of July 2022, no announcement of construction is listed on the Gaz-System webpage for the project, and the project does not feature a new date for commissioning.[3] Instead, the pipeline is listed as being in the "engineering design" phase of its development.[8]
Articles and resources
References
- ↑ 1.0 1.1 1.2 Skoczów-Komorowice-Oświęcim Gas Pipeline, Gaz-System, accessed August 2020
- ↑ 2.0 2.1 2.2 2.3 2.4 "Gazociąg Skoczów – Komorowice – Oświęcim" (PDF). GAZ-SYSTEM. Retrieved August 26, 2021.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 3.0 3.1 "GAZOCIĄG SKOCZÓW-KOMOROWICE-OŚWIĘCIM". Gaz System. Retrieved August 26, 2021.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "BEMIP Gas Regional Investment Plan - Annex : Infrastructure Projects" (PDF). ENTSOG. 2012. Retrieved August 26, 2021.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "National Report of the President of the Energy Regulatory Office" (PDF). URE.gov.pl. Retrieved August 26, 2021.
{{cite web}}
: CS1 maint: url-status (link) - ↑ SKOCZOW-KOMOROWICE-OSWIECIM-TWORZEN GAS PIPELINE, Antea Group, Feb. 4, 2019
- ↑ "Obwieszczenie ws. ustalenia lokalizacji inwestycji towarzyszącej inwestycji w zakresie terminalu regazyfikacyjnego skroplonego gazu ziemnego w Świnoujściu dla inwestycji pn.: „Budowa gazociągu DN 500 MOP 8,4 MPa Skoczów – Komorowice – Oświęcim" - Ministerstwo Rozwoju i Technologii - Portal Gov.pl". Ministerstwo Rozwoju i Technologii (in polski). Retrieved 2021-08-26.
- ↑ www.gaz-system.pl https://www.gaz-system.pl/en/transmission-system/investment-projects/other-major-investment-projects/skoczow-komorowice-oswiecim.html. Retrieved 2022-07-14.
{{cite web}}
: Missing or empty|title=
(help)