Skoczów-Komorowice-Oświęcim Gas Pipeline is a proposed gas pipeline in Poland.[1]

Location

The pipeline would run through the municipalities of Skoczów, Jasienica, Bielsko-Biała, Bestwina, Wilamowice, Kęty, and Oświęcim.[1][2]

Loading map...

Pipeline Details

  • Operator: Gaz-System[2]
  • Owner: Gaz-System[2]
  • Parent: Gaz-System[2]
  • Proposed Capacity:
  • Length: 53 km / 33 miles[3]
  • Diameter: 500 mm / 20 inches[2]
  • Cost: €32 million (US$36.48 million)[4]
  • Status: Proposed
  • Start Year: 2021

Background

A positive environmental impact assessment (EIA) was issued for the pipeline in February 2015.[1] As of 2018, the pipeline was in the design phase.[5]

In 2019, Gaz-System anticipated obtaining a building permit in 2021.[6]

On April 27, 2021, plans relating to the location of the pipeline were approved by the Polish government.[7]

As of July 2022, no announcement of construction is listed on the Gaz-System webpage for the project, and the project does not feature a new date for commissioning.[3] Instead, the pipeline is listed as being in the "engineering design" phase of its development.[8]

Articles and resources

References

  1. 1.0 1.1 1.2 Skoczów-Komorowice-Oświęcim Gas Pipeline, Gaz-System, accessed August 2020
  2. 2.0 2.1 2.2 2.3 2.4 "Gazociąg Skoczów – Komorowice – Oświęcim" (PDF). GAZ-SYSTEM. Retrieved August 26, 2021.{{cite web}}: CS1 maint: url-status (link)
  3. 3.0 3.1 "GAZOCIĄG SKOCZÓW-KOMOROWICE-OŚWIĘCIM". Gaz System. Retrieved August 26, 2021.{{cite web}}: CS1 maint: url-status (link)
  4. "BEMIP Gas Regional Investment Plan - Annex : Infrastructure Projects" (PDF). ENTSOG. 2012. Retrieved August 26, 2021.{{cite web}}: CS1 maint: url-status (link)
  5. "National Report of the President of the Energy Regulatory Office" (PDF). URE.gov.pl. Retrieved August 26, 2021.{{cite web}}: CS1 maint: url-status (link)
  6. SKOCZOW-KOMOROWICE-OSWIECIM-TWORZEN GAS PIPELINE, Antea Group, Feb. 4, 2019
  7. "Obwieszczenie ws. ustalenia lokalizacji inwestycji towarzyszącej inwestycji w zakresie terminalu regazyfikacyjnego skroplonego gazu ziemnego w Świnoujściu dla inwestycji pn.: „Budowa gazociągu DN 500 MOP 8,4 MPa Skoczów – Komorowice – Oświęcim" - Ministerstwo Rozwoju i Technologii - Portal Gov.pl". Ministerstwo Rozwoju i Technologii (in polski). Retrieved 2021-08-26.
  8. www.gaz-system.pl https://www.gaz-system.pl/en/transmission-system/investment-projects/other-major-investment-projects/skoczow-komorowice-oswiecim.html. Retrieved 2022-07-14. {{cite web}}: Missing or empty |title= (help)

Related GEM.wiki articles

External resources

External articles