Skopje-Tetolo-Gostivar Gas Pipeline
From Global Energy Monitor
Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Related categories: |
Skopje-Tetolo-Gostivar Gas Pipeline is an under-construction pipeline in North Macedonia.
Location
The pipeline will run from Skopje, toward Tetolo before turning south to Gostivar. A 10km branch connects Tetolo to the main segment.
Project details
- Capacity:
- Length: 87 kilometers[4]
- Diameter:
- Skopje-Gostivar: 500 mm
- Tetolo Branch: 150 mm[7]
- Status: Under construction[8]
- Start year: 2022
- Cost: EUR 29 million[9]
- Financing:
- Associated infrastructure:
Background
Following reporting from the Government of North Macedonia that the pipeline's construction was 53% complete in November 2019, as of January 2024 the progress on construction was unclear.[10]
Articles and resources
References
- ↑ European Bank for Reconstruction and Development (Apr, 2020). "Gas distribution network in North Macedonia Update of Feasibility study" (PDF). EBRD. Retrieved Jul 25th, 2022.
{{cite web}}
: Check date values in:|access-date=
and|date=
(help); line feed character in|title=
at position 34 (help)CS1 maint: url-status (link) - ↑ "NATIONAL ENERGY RESOURCES Skopje". mer.com.mk. Retrieved 2022-07-25.
- ↑ "Consolidated Annual Activity Report of Bulgartransgaz EAD" (PDF). Bulgarian Energy Holdings. Dec 31st, 2020. Retrieved Jul 25th, 2022.
{{cite web}}
: Check date values in:|access-date=
and|date=
(help)CS1 maint: url-status (link) - ↑ "NATIONAL ENERGY RESOURCES Skopje". mer.com.mk. Retrieved 2022-07-25.
- ↑ "National gas pipeline section "Skopje – Tetovo - Gostivar" | RapidBild". rapidbild.com.mk. Retrieved 2022-07-25.
- ↑ "SKOPJE-TETOVO-GOSTIVAR GAS PIPELINE TO BE COMPLETE BY SECOND HALF OF 2021. - Free Online Library". www.thefreelibrary.com. Retrieved 2022-07-25.
- ↑ "NATIONAL ENERGY RESOURCES Skopje". mer.com.mk. Retrieved 2022-07-25.
- ↑ "Skopje-Tetovo-Gostivar Gas Pipeline". www.investinsee.com. Retrieved 2022-07-25.
- ↑ "Zaev: The gas pipeline from Skopje, Tetovo to Gostivar will be over during 2020". META.MK. Nov 13th, 2019. Retrieved Jul 25th, 2022.
{{cite web}}
: Check date values in:|access-date=
and|date=
(help)CS1 maint: url-status (link) - ↑ New study offers reality check on fossil gas in North Macedonia, CEE Bankwatch Network, Jan. 30, 2024