Solar Arrow solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Heliako Velos
Solar Arrow solar farm (Ηλιακο Βελος (Λκδμ)) is a solar photovoltaic (PV) farm under construction in Kozani Regional Unit, Western Macedonia, Greece.
Project Details
Table 1: Phase-level project details for Solar Arrow solar farm
Phase name | Status | Nameplate capacity | Technology | Owner |
---|---|---|---|---|
1 | Construction[1] | 200 MWp/dc[1] | PV[1] | Public Power Corporation of Greece (PPC) [100%] (Δεη Ανανεωσιμες Αε)[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Solar Arrow solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Kozani Regional Unit, Western Macedonia, Greece[1] | 40.4674, 21.7895 (exact)[1] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20240301134205/https://geo.rae.gr/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220325193932/https://www.ppcr.gr/en/solar-under-construction/solar-arrow-1-ptolemaida. Archived from the original on 25 March 2022.
{{cite web}}
: Missing or empty|title=
(help)