Somiani–Nawabshah Gas Pipeline
From Global Energy Monitor
Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Related categories: |
Somiani–Nawabshah Gas Pipeline was a proposed gas pipeline in Pakistan which is now considered Shelved.[1]
Location
The pipeline starts in Sonmiani, Balochistan and ends in Nawabshah, Sindh.[1]
Project Details
- Operator: Inter State Gas Systems (Private) Ltd[2]
- Owner: Inter State Gas Systems (Private) Ltd[2]
- Parent company: Inter State Gas Systems (Private) Ltd[2]
- Capacity: 700 to 1200 MMCFD[1]
- Length: 310 km / 192.63 miles[2]
- Diameter:
- Status: Shelved [2]
- Start year: 2018[2]
- Cost:
- Financing:
- Associated infrastructure:
Background
The pipeline will connect the planned Bahria Foundation LNG re-gasification terminal at Sonmiani with Nawabshah. The initial part of the pipeline (158 km) will follow Dureji Road until it meets Iran Pakistan Gas pipeline near Dureji. From Dureji to Nawabshah (152km), it will follow the Iran Pakistan Gas pipeline route.[1][2]
There has been no development on the project since 2021 and it is therefore considered shelved.[2]