South Sumatra West Java Phase II Gas Pipeline
From Global Energy Monitor
Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Related categories: |
The South Sumatra West Java Phase II Gas Pipeline is an operating natural gas pipeline.[1] It is also known as the SSWJ II Gas Pipeline.
Location
The pipeline runs from Grissik through Pagardewa, Labuhan Maringgai in South Sumatra to Muara Bekasi and Rawamaju in West Java.
Project Details
- Operator: PT Pertamina Gas[2]
- Owner: PT Pertamina Gas[2]
- Parent company: PGN (Persero) Tbk [51%]; Pertamina [49%][3]
- Capacity: 530 million cubic feet per day[1]
- Length: 628.21 kilometers[2]
- Diameter: 32, 28 inches[2]
- Status: Operating[2]
- Start Year: 2008
- Cost:
- Financing:
- Associated infrastructure:
Background
The pipeline is originally owned and operated by PT Pertamina Gas.
Articles and resources
References
- ↑ 1.0 1.1 PGN Company Overview, Gas Negara, January 2009
- ↑ 2.0 2.1 2.2 2.3 2.4 https://jdih.esdm.go.id/storage/document/Kepmen%20ESDM%2010.K.MG.01.MEM.M.2023%20ttg%20RIJTDGBN.pdf
- ↑ PGN Pertagas Caplok, 9,677 Km Gas Pipes will be Connected, CNBC Indonesia, Jul. 18, 2018