Sparanise power station (Centrale Termoelettrica di Sparanise) is an operating power station of at least 760-megawatts (MW) in Sparanise, Caserta, Italy with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Sparanise power station | Sparanise, Caserta, Italy | 41.1783, 14.1129 (exact)[1] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2, Unit CC1, Unit CC2: 41.1783, 14.1129
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Retired year |
---|---|---|---|---|---|---|---|
Unit 1 | operating[2] | fossil gas - natural gas[3] | 380[3] | combined cycle[4] | – | 2007[4] | – |
Unit 2 | operating[2] | fossil gas - natural gas[3] | 380[3] | combined cycle[4] | – | 2007[4] | – |
Unit CC1 | shelved[5] | fossil gas - natural gas[6] | 620[5] | gas turbine[5] | – | – | – |
Unit CC2 | shelved[5] | fossil gas - waste heat from natural gas, bioenergy - unknown[5] | 320[5] | steam turbine[5] | – | – | – |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner |
---|---|
Unit 1 | Calenia Energia SpA [100.0%] |
Unit 2 | Calenia Energia SpA [100.0%] |
Unit CC1 | Calenia Energia SpA [100.0%] |
Unit CC2 | Calenia Energia SpA [100.0%] |
Background
The new combined cycle power plant, according to a 2020 non-technical summary, is being built to be able to operate in either an open cycle gas turbine or a combined cycle unit. The steam turbine which would allow the unit to function as a combined cycle unit is expected to be constructed the year following the completion of the gas turbine.[7]
Calenia Energia started the Environmental Impact Assessment process, according to the Ministero Della Transizione Ecologica, in August 2020. As of November 2021, it has not yet been completed. [8]
The development of this plant has been protested by grassroots activist organizations in Italy, notably the Spazio Association Cales.[9] As of Oct, 2022, the project is presumed shelved due to a lack of development since 2020.
Articles and Resources
References
- ↑ https://web.archive.org/web/20230103182122/https://datasets.wri.org/dataset/globalpowerplantdatabase. Archived from the original on 03 January 2023.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.0 2.1 https://web.archive.org/web/20221107230119/https://transparency.entsoe.eu/. Archived from the original on 07 November 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 https://web.archive.org/web/20210925001508/https://www.appiapolis.it/2020/11/23/nuova-centrale-da-1700-mw-a-sparanise-entro-venerdi-11-dicembre-si-puo-ancora-dire-no/. Archived from the original on 25 September 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 https://web.archive.org/web/20221207071419/https://www.caleniaenergia.it/en/plant/. Archived from the original on 07 December 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 5.4 5.5 5.6 https://web.archive.org/web/20211112211836/https://va.minambiente.it/File/Documento/420297. Archived from the original on 12 November 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20221006054654/http://carbontracker.org/reports/foot-off-the-gas-italy/. Archived from the original on 06 October 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ "Centrale Termoelettrica di Sparanise (CE) Nuovo Gruppo di Generazione a Ciclo Combinato - Sintesi Non Tecnica". ministero della transizione ecologica. July 31, 2020. Retrieved November 5, 2021.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Centrale da 800 MW nel Comune di Sparanise - Info - Valutazioni e Autorizzazioni Ambientali - VAS - VIA - AIA". va.minambiente.it. Retrieved 2021-11-05.
- ↑ "NUOVA CENTRALE DA 1700 MW A SPARANISE, ENTRO VENERDÌ 11 DICEMBRE SI PUO' ANCORA DIRE NO". AppiaPolis - News in Tempo Reale (in italiano). 2020-11-23. Retrieved 2022-10-13.
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.