Spearville wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Spearville wind farm is an operating wind farm in Spearville, Ford County, Kansas, United States.

Project Details

Table 1: Phase-level project details for Spearville wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Operating[1] 2006[1] 100 MW[2] Onshore[2] Evergy Inc [100%][3] EDF Renewables (法國電力再生能源公司)[4]
2 Operating[1] 2010[1] 48 MW[2] Onshore[2] Evergy Inc [100%][3] EDF Renewables (法國電力再生能源公司)[5]
3 Operating[1] 2012[1] 101 MW[2] Onshore[2] EDF Renewables [20%]; Eurus Energy [40%]; Blackrock Inc [40%] (法國電力再生能源公司; 株式会社ユーラスエナジーホールディングス)[6][6][6] EDF Renewables (法國電力再生能源公司)[6]

Location

Table 2: Phase-level location details for Spearville wind farm

Phase Name Location Coordinates (WGS 84)
1 Spearville, Ford County, Kansas, United States[2] 37.8875, -99.7418 (exact)[2]
2 Ford County, Kansas, United States[2] 37.8608, -99.7433 (exact)[2]
3 Ford County, Kansas, United States[2] 37.8793, -99.7922 (exact)[2]

The map below shows the exact locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20221028021258/https://www.eia.gov/electricity/data/eia860/. Archived from the original on 28 October 2022. {{cite web}}: Missing or empty |title= (help)
  2. 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 https://doi.org/10.5066/F7TX3DN0. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://web.archive.org/web/20211008001539/https://www.power-eng.com/renewables/wind/evergy-wind-power-production-tops-75-million-mwh/. Archived from the original on 08 October 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. https://web.archive.org/web/20240131031028/https://www.thewindpower.net/windfarm_en_2988.php. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20240131030838/https://www.thewindpower.net/windfarm_en_19041.php. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 https://web.archive.org/web/20240131030941/https://eurusenergy.com/news/press-releases/eurus-energy-america/spearville-3-wind-project/. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)