Search results
From Global Energy Monitor
- transfer (BOOT) contract for this Uruguay LNG terminal project. In 2013 GDF Suez was awarded the BOOT contract, and in 2014 Marubeni became a 50-50 partner3 KB (436 words) - 21:07, 17 October 2023
- Southern Cross Gas Pipeline (category Existing Pipelines in Uruguay)Canelones y Montevideo in Uruguay. The pipeline ranges in diameter from 18 to 24 inches. The pipeline is supplied from Argentina's gas fields in the Neuquén Basin10 KB (1,425 words) - 21:28, 11 July 2024
- Energy profile: Brazil (section Coal in Brazil)Brazil has three long-established LNG import terminals in Guanabara Bay, Bahia, and Pecém, plus two newer terminals in Sergipe and Porto do Açu (Rio de30 KB (2,836 words) - 18:29, 29 September 2022
- Energy profile: Chile (section Coal in Chile)and Mexico. The country's two main LNG import terminals are the Quintero LNG Terminal and the Mejillones LNG Terminal. Four international pipelines - the23 KB (2,160 words) - 22:26, 18 September 2022
- Energy profile: Argentina (section Coal in Argentina)fuels (vs. 61.75% in 2019), 18.47% from hydro (vs. 27.25% in 2019), 8.13% from nuclear (vs 6.11% in 2019), 7.18% from wind (vs. 3.85% in 2019), and less28 KB (2,651 words) - 23:20, 20 September 2022
- Energy profile: Mexico (section Coal in Mexico)Costa Azul, and Manzanillo LNG terminals, and is slated to begin exporting LNG in 2025 via the new Costa Azul Export Terminal. Mexico is Latin America's40 KB (3,664 words) - 14:19, 22 September 2023
- generation, with most of the remainder being exported as LNG from the country's Atlantic LNG Terminal. As of 2018, Trinidad and Tobago had an estimated 22019 KB (1,821 words) - 11:04, 27 September 2022
- on request to Sempra unit's LNG export permit, say sources". Reuters. "Sempra Energy and Partner Planning New LNG Terminal in Mexico". The TEX Report Ltd41 KB (4,016 words) - 16:03, 3 October 2022
- Centro Oeste Gas Pipeline (category Existing Pipelines in Argentina)pipeline in Argentina. The Gasoducto Centro Oeste runs from the Loma La Lata gas field in Neuquén province to the San Jerónimo compressor plant in Santa Fe5 KB (652 words) - 10:02, 22 August 2023
- Punta del Tigre B power station (category Oil & Gas power stations in Uruguay)an operating power station of at least 540-megawatts (MW) in Punta del Tigre, San José, Uruguay. The map below shows the exact location of the power station7 KB (663 words) - 23:53, 13 September 2024
- Gran Gasoducto del Sur Gas Pipeline (category Proposed pipelines in Uruguay)Sul state and Uruguay and then cross Uruguay to Buenos Aires, Argentina. The Puerto Ordaz-Marabá section was planned to have a 1700 mm (66 in) diameter and7 KB (897 words) - 13:59, 27 July 2022
- projected LNG facilities in Uruguay, Chile, and Argentina. For years, insufficient transportation infrastructure held back oil and gas development in Vaca Muerta23 KB (2,887 words) - 19:13, 9 October 2024
- Gasoducto del Litoral Gas Pipeline (category Existing Pipelines in Uruguay)pipeline consists of a 15-kilometer, 10-inch section In Argentina, and a 12.2-kilometer section in Uruguay that uses a combination of 2-, 4-, 8- and 10-inch3 KB (388 words) - 09:09, 25 August 2023
- 378 MW, la primera planta a gas natural de El Salvador, y la Acajutla LNG Terminal, la primera unidad flotante de almacenamiento y regasificación de Centroamérica16 KB (1,464 words) - 07:56, 21 September 2022
- Delta Caribe Oriental Terminal (category Proposed LNG terminals in Venezuela)Delta Caribe Oriental Terminal, also called the CIGMA Complex LNG Terminal, was a proposed LNG terminal in Venezuela. There have been no development updates3 KB (332 words) - 23:59, 29 June 2023
- Néstor Kirchner Gas Pipeline (category Proposed pipelines in Argentina)url-status (link) "Brazil prepares for a new phase of investments in LNG terminals". LNG Latin America & the Caribbean. Retrieved 2021-04-17. "Cómo es el39 KB (4,323 words) - 16:58, 16 July 2024
- of Mines and Energy (MME). The LNG produced at the plant will be distributed by truck to customers in southern Brazil. In April 2021, New Fortress Energy2 KB (305 words) - 14:10, 25 September 2022
- Terminal de GNL de Geramar (category Terminales de GNL en América Latina y el Caribe)url-status (link) "Brazil prepares for a new phase of investments in LNG terminals". LNG Latin America & the Caribbean. Retrieved 2021-04-17. "Plano de Desenvolvimento5 KB (520 words) - 13:38, 25 September 2022
- Maximum annual demand rose from 666 MW in 1997 to 1072 MW in 2018. Demand for electricity in El Salvador has grown in conjunction with the introduction of15 KB (1,315 words) - 07:54, 21 September 2022
- Punta del Tigre A power station (category Oil & Gas power stations in Uruguay)an operating power station of at least 300-megawatts (MW) in Punta del Tigre, San José, Uruguay. The map below shows the exact location of the power station11 KB (829 words) - 23:53, 13 September 2024