Search results
From Global Energy Monitor
- Shabwah-Bir Ali Pipeline (category Oil and gas infrastructure in Yemen) (section Articles and resources)of 135,000 bpd and is 209 kilometers long. The oil industry in Yemen has been severely affected by the ongoing civil war, with crude oil exports suspended3 KB (298 words) - 21:02, 4 December 2024
- Masila-Ash Shihr Oil Pipeline (category Oil and gas infrastructure in Yemen) (section Articles and resources)000 bpd. The oil industry in Yemen has been severely affected by the ongoing civil war, with crude oil exports suspended. It is likely the oil pipeline is2 KB (237 words) - 20:51, 4 December 2024
- Jebel Ali FLNG Terminal (category Global Gas Infrastructure Tracker) (section Middle East and LNG imports)Terminal in Kuwait in 2009, Jebel Ali FLNG Terminal in Dubai in 2010, Hadera LNG Terminal in Israel in 2013, Jordan through Aqaba Jordan LNG Terminal in 201510 KB (1,267 words) - 19:20, 4 December 2024
- East-West Crude Oil Pipeline (category Global Oil Infrastructure Tracker) (section Articles and resources)East-West Crude Oil Pipeline, خط أنابيب شرق-غرب also known as the Petroline and Abqaiq-Yanbu oil pipeline, is an oil pipeline in Saudi Arabia. The pipeline7 KB (778 words) - 20:56, 4 December 2024
- explore for and produce oil and gas under 15 different production sharing arrangements with BP Migas, Indonesia's national upstream oil and gas regulator3 KB (442 words) - 11:24, 30 April 2021
- Yemen LNG Terminal (category Global Gas Infrastructure Tracker) (section Civil War and Military Intervention)"icon":""}]} Operator: Yemen LNG Owner: Yemen LNG Parent: Total (39.62%), Yemen Gas (16.73%), Hunt Oil (17.22%), SK Energy (9.55%), Korea Gas (6%), Hyundai (56 KB (786 words) - 19:50, 4 December 2024
- MENA Renewables Brief 2023 Methodology (section Solar and wind capacity needed to match electricity generation of gas)generation from oil and gas power plants were calculated as follows: Oil and Gas Generation [TWh] = Oil and Gas Capacity [GW] * Oil and Gas Capacity Factor18 KB (2,213 words) - 22:30, 25 September 2023
- Marib-Ras Isa Oil Pipeline (category Existing oil pipelines in Yemen) (section Articles and resources)Marib-Ras Isa Oil Pipeline is an operating oil pipeline in Yemen. The pipeline runs from Marib to the Ras Issa Oil Terminal. Loading map... {"type":"ROADMAP"4 KB (537 words) - 20:56, 4 December 2024
- Ma'rib Methane Observation 2022-08-21, 1 (category Oil and gas extraction) (section Articles and Resources)plume detected by CarbonMapper's NASA-JPL EMIT on 2022-08-21 11:00:23 in Ma'rib, in Yemen. The estimated emissions rate for this plume was 1933.598280748873 KB (308 words) - 18:33, 13 September 2024
- Ma'rib Methane Observation 2023-02-20, 1 (category Oil and gas extraction) (section Articles and Resources)plume detected by CarbonMapper's NASA-JPL EMIT on 2023-02-20 10:32:20 in Ma'rib, in Yemen. The estimated emissions rate for this plume was 2478.039502795933 KB (308 words) - 18:33, 13 September 2024
- Ma'rib Methane Observation 2023-04-23, 1 (category Oil and gas extraction) (section Articles and Resources)plume detected by CarbonMapper's NASA-JPL EMIT on 2023-04-23 10:01:36 in Ma'rib, in Yemen. The estimated emissions rate for this plume was 5381.878856499193 KB (308 words) - 18:33, 13 September 2024
- Ma'rib Methane Observation 2023-10-08, 1 (category Oil and gas extraction) (section Articles and Resources)plume detected by CarbonMapper's NASA-JPL EMIT on 2023-10-08 05:15:36 in Ma'rib, in Yemen. The estimated emissions rate for this plume was 2878.243826977083 KB (308 words) - 18:33, 13 September 2024
- Ma'rib Methane Observation 2023-06-30, 1 (category Oil and gas extraction) (section Articles and Resources)plume detected by CarbonMapper's NASA-JPL EMIT on 2023-06-30 07:06:49 in Ma'rib, in Yemen. The estimated emissions rate for this plume was 1311.071974049233 KB (308 words) - 18:33, 13 September 2024
- Ma'rib Methane Observation 2023-02-24, 1 (category Oil and gas extraction) (section Articles and Resources)plume detected by CarbonMapper's NASA-JPL EMIT on 2023-02-24 08:58:31 in Ma'rib, in Yemen. The estimated emissions rate for this plume was 1002.786607354533 KB (308 words) - 18:33, 13 September 2024
- Ma'rib Methane Observation 2023-09-03, 1 (category Oil and gas extraction) (section Articles and Resources)plume detected by CarbonMapper's NASA-JPL EMIT on 2023-09-03 05:26:58 in Ma'rib, in Yemen. The estimated emissions rate for this plume was 1823.545009111363 KB (308 words) - 18:33, 13 September 2024
- Calculated for Global Oil and Gas Plant Tracker The Global Oil and Gas Plant Tracker assumes the median lifecycle emissions as reported in the IPCC 5th Assessment50 KB (993 words) - 20:14, 30 September 2024