Search results

From Global Energy Monitor
Results 1 – 11 of 11
Advanced search

Search in namespaces:

  • Tanzania LNG Terminal (category Proposed LNG Terminals in Tanzania)
    Tanzania LNG Terminal is a proposed LNG terminal in Lindi Region, Tanzania. The map below shows the location of the project, in Lindi District, Lindi Region
    10 KB (1,169 words) - 19:52, 4 December 2024
  • Uganda–Tanzania Crude Oil Pipeline or Hoima–Tanga Port Oil Pipeline, is a proposed oil pipeline in East Africa. The oil pipeline would start in Buseruka
    40 KB (5,302 words) - 21:02, 4 December 2024
  • Washington state. Another coal export terminal proposed in Longview, the Millennium Bulk Logistics Longview Terminal in southwest Washington, has drawn environmental
    139 KB (18,653 words) - 15:07, 20 July 2021
  • Lamu Port-South Sudan (LAPSSET) Pipeline (category Proposed pipelines in South Sudan)
    is a proposed oil pipeline in South Sudan and Kenya. The LAPSSET Corridor was proposed after the Lokichar–Lamu Oil Pipeline was originally proposed as the
    21 KB (3,351 words) - 21:05, 4 December 2024
  • Tazama Oil Pipeline (category Existing oil pipelines in Tanzania) (section Proposed Expansion)
    of in Dar-es-Salaam, Tanzania, to the Tanzanian and Italian Petroleum Refining Company (TIPER) refinery in Dar-es-Salaam and the Indeni refinery in Ndola
    7 KB (1,250 words) - 21:00, 4 December 2024
  • Uganda–Kenya Crude Oil Pipeline (UKCOP) (category Proposed pipelines in Uganda)
    to keep it in its liquid form, which would have made it the longest heated pipeline in the world. In March 2016, the presidents of Tanzania and Uganda
    5 KB (710 words) - 21:05, 4 December 2024
  • Tanzania Uganda Pipeline (category Proposed pipelines in Tanzania)
    Tanzania Uganda Pipeline is a proposed gas pipeline in Tanzania and Uganda. As of September 2021, it is considered shelved. The pipeline was proposed to
    2 KB (328 words) - 19:09, 4 December 2024
  • Tanzania–Kenya Gas Pipeline (category Proposed pipelines in Tanzania)
    Tanzania–Kenya Gas Pipeline is a proposed pipeline that would run from Dar es Salaam, Tanzania to Mombasa, Kenya. The pipeline would run from Dar es Salaam
    3 KB (430 words) - 19:31, 4 December 2024
  • Kilwa power station (category Oil & Gas power stations in Tanzania)
    track this information in the Captive Use section when known. The plant is expected to come online in 2025. As of July 2022, the proposed plant is presumed
    3 KB (287 words) - 23:08, 13 September 2024
  • Somanga Fungu power station (category Oil & Gas power stations in Tanzania)
    track this information in the Captive Use section when known. The plant is expected to come online in 2025. As of July 2022, the proposed plant is presumed
    5 KB (511 words) - 00:16, 14 September 2024
  • Dongo Kundu power station (category Oil & Gas power stations in Kenya)
    Suez. In 2014, Business Daily reported that the then president of Kenya had secured 1 million tonnes of LNG yearly from a Qatari state firm. In 2016, plans
    7 KB (627 words) - 22:23, 13 September 2024