Search results
From Global Energy Monitor
- Mombasa LNG Terminal (category Proposed LNG terminals in Kenya)Mombasa LNG Terminal is a proposed LNG import terminal in Mombasa, Kenya. As of July 2024 the project is presumed to be shelved, because there have been4 KB (559 words) - 18:03, 17 July 2024
- Lamu Port-South Sudan (LAPSSET) Pipeline (redirect from Kenya Crude Oil Pipeline) (category Proposed pipelines in Kenya) (section Original Kenya Crude Oil Pipeline)is a proposed oil pipeline in South Sudan and Kenya. The LAPSSET Corridor was proposed after the Lokichar–Lamu Oil Pipeline was originally proposed as the21 KB (3,351 words) - 19:36, 9 May 2024
- East African Crude Oil Pipeline (EACOP) (category Proposed oil pipelines in Uganda) (section Arrest of environmental activists in Uganda)Mombasa or Lamu routes in Kenya. At the same summit, President Uhuru Kenyatta announced that Kenya would build the Kenya Crude Oil Pipeline on its own, thereby40 KB (5,302 words) - 20:27, 8 October 2024
- Uganda–Kenya Crude Oil Pipeline (UKCOP) (category Proposed pipelines in Kenya)SA, CNOOC Proposed capacity: Length: 1500 kilometers Status: Cancelled Start Year: The Uganda–Kenya Crude Oil Pipeline (UKCOP) was a proposed pipeline to5 KB (710 words) - 21:20, 22 February 2022
- Mombasa-Nairobi Petroleum Products Pipeline (category Existing pipelines in Kenya)Government of Kenya. The replacement pipeline will run along the same route as the original pipeline, from Mombasa in Mombasa County, Kenya, to Nairobi in Nairobi4 KB (550 words) - 11:02, 30 April 2021
- Tanzania–Kenya Gas Pipeline (category Proposed pipelines in Kenya)Government of Kenya Capacity: Length: 600 kilometers Diameter: Status: Proposed Cost: US$1.1 billion In April 2021, it was reported that Kenya and Tanzania3 KB (430 words) - 07:04, 17 September 2023
- Kenya-Ethiopia (LAPSSET) Pipeline (category Proposed oil and gas pipelines in Kenya)Kenya-Ethiopia Pipeline is a proposed petroleum products pipeline, running from Lamu, Kenya, to Addis Ababa, Ethiopia. It is a component of the larger3 KB (354 words) - 10:48, 30 April 2021
- Eldoret-Kampala-Kigali Petroleum Products Pipeline (category Proposed oil and gas pipelines in Kenya)Operator: Unclear; proposed by governments of Kenya, Uganda, & Rwanda Parent Company: Proposed capacity: Length: 784 km Status: Proposed Start Year: Oil Pipe3 KB (365 words) - 20:39, 29 April 2021
- Dongo Kundu power station (category Oil & Gas power stations in Kenya)Suez. In 2014, Business Daily reported that the then president of Kenya had secured 1 million tonnes of LNG yearly from a Qatari state firm. In 2016, plans7 KB (627 words) - 22:23, 13 September 2024
- Ronier–Djermaya Oil Pipeline (category Existing oil pipelines in Chad)contract was made. In 2013, the government of Chad suspended all operations conducted by CNPC in the country due to environmental degradation in the Koudalwa8 KB (1,082 words) - 02:58, 17 February 2022