Search results

From Global Energy Monitor
Results 1 – 19 of 19
Advanced search

Search in namespaces:

Did you mean: section template
  • geology allows their use. Once the coal is removed, usually 75 percent of the section, the roof is allowed to collapse in a safe manner. This method utilizes
    30 KB (3,913 words) - 18:05, 19 April 2021
  • Fracking and water pollution (category Pages using duplicate arguments in template calls)
    homeowners. EPA also issued an imminent and substantial endangerment order under Section 1431 of the Safe Drinking Water Act. The EPA said it has data showing the
    71 KB (8,917 words) - 10:46, 30 April 2021
  • Texas and fracking (category Pages using duplicate arguments in template calls)
    homeowners. EPA also issued an imminent and substantial endangerment order under Section 1431 of the Safe Drinking Water Act. The EPA said it has data showing the
    69 KB (8,814 words) - 11:06, 30 April 2021
  • under the Copyright Act 1968 - Section 41 (Fair dealing for purpose of criticism or review) and/or Copyright Act 1968 - Section 41A (Fair dealing for the purpose
    8 KB (944 words) - 13:46, 7 June 2021
  • longer economically viable, and U.S. Steel abandoned the line. A Template:Convert section of track was retained to serve Atlas Cement. The remainder of the
    22 KB (2,665 words) - 22:59, 8 July 2022
  • 2022-02-27. Template:Harvnb Template:Harvnb; Template:Harvnb Template:Harvnb Template:Harvnb Template:Harvnb; Template:Harvnb Template:Harvnb Template:Harvnb
    35 KB (4,671 words) - 19:25, 27 March 2023
  • calls for the power station to be closed. (See Proposals to close Hazelwood section below). In an opinion column, David Karoly, a professor in the school of
    60 KB (6,333 words) - 06:51, 18 February 2024
  • Salt Lake oil field (category Pages using duplicate arguments in template calls)
    California. Association of Engineering Geologists. Southern California Section. p. 769. ISBN 0-89863-171-8. {{cite book}}: Unknown parameter |coauthors=
    7 KB (990 words) - 11:05, 30 April 2021
  • crack and corrode. Now, in 2005, Enbridge actually had learned that this section of pipe was cracked and corroding. ... That same 2005 internal report pointed
    15 KB (1,923 words) - 21:06, 2 March 2023
  • / 545 miles Status: Operating Diameter: Main onshore section: 1,200 mm / 47 inches Offshore section: 900 mm / 35 inches Cost: €4.5 billion (US$5.46 billion)
    43 KB (5,636 words) - 12:57, 11 August 2022
  • to promote the island as an international tourism destination. Template:Expand section In October 2008, the Chairman Larry Yung disclosed that the firm
    17 KB (1,814 words) - 18:58, 17 April 2020
  • removed CabinCr3w's post, but it could still be viewed on the trending pastes section of the website. CabinCr3w tweeted, "To the people asking... we are part
    16 KB (1,842 words) - 23:30, 14 July 2021
  • Sakakawea and Carlyle Reservoir, under Section 14 of the Rivers and Harbors Act of 1899, codified 33 U.S.C. Section 408 (Section 408) permissions to modify the
    131 KB (16,239 words) - 16:48, 27 September 2023
  • ESPO Pipeline section online". Pipelines International. Scientific Surveys, Great Southern Press. 2009-12-22. Retrieved 2009-12-28. Template:Site news "Russia-China
    30 KB (5,397 words) - 18:41, 1 March 2024
  • "lon":39.658057,"icon":"","inlineLabel":"Mothballed Mine\n"}]} Note: The above section was automatically generated and is based on data from the GEM April 2024
    9 KB (911 words) - 21:22, 9 April 2024
  • Assessment regarding the repair of the cathodic protection system of a section of the pipeline that passes through the Preserve, including a 4.5 mi stretch
    13 KB (1,644 words) - 20:34, 29 April 2021
  • completed in 2005. The Azerbaijan section was constructed by Consolidated Contractors International of Greece, and Georgia's section was constructed by a joint
    45 KB (5,711 words) - 17:55, 12 February 2024
  • high efficiencies. Coal units track this information in the Captive Use section when known. https://goo.gl/maps/Thbiu4yax1Vmzw4k9. {{cite web}}: Missing
    7 KB (537 words) - 21:05, 11 May 2024
  • remove the need for federal approval. TC Energy said that work on that section of the pipeline could start in June 2012 and be on-line by the middle to
    125 KB (15,351 words) - 17:24, 18 April 2022