Search results
From Global Energy Monitor
- Abba Steel Ohangwena steel plant (category Steel plants in Namibia) (section Table 4: Crude Steel Production Capacities (thousand tonnes per annum))Abba Steel Ohangwena steel plant, also known as Groot Suisse Oshana plant, is an electric arc furnace (EAF) steel plant under construction in Oshikango5 KB (397 words) - 17:37, 11 April 2024
- Hyron Steel Namibia plant (category Steel plants in Namibia) (section Table 1: Green Steel Project Details)Hyron Steel Namibia plant is a direct reduced iron-electric arc furnace (DRI-EAF) steel plant under construction in Namibia. The map below shows the approximate8 KB (366 words) - 17:53, 11 April 2024
- Proposed coal plants in Africa and the Middle East (category Proposed coal plants in Africa) (section Map of proposed coal-fired power plants in Africa and the Middle East (updated December 2015))coal plants in Europe Proposed coal plants in India Proposed coal plants in Latin America Proposed coal plants in Turkey Proposed coal plants in the United34 KB (4,033 words) - 11:04, 30 April 2021
- likely to be consumed by steel plants in Brazil; thermal coal would be consumed by a new coal-fired powerplant built by CVRD in Mozambique with a capacity29 KB (4,102 words) - 18:52, 12 August 2021
- Project, a 6 x 660 MW plant in India. In China, 90,000 metric tons of turbine house steel structure will be coated with Jotun coatings, in addition to six sets125 KB (15,694 words) - 20:40, 2 August 2021
- Zimbabwe and coal (section Proposed coal plants)been granted a licence to build a 2,000 MW thermal power plant in Zimbabwe for US$3 billion. In September 2015 Sable Mining announced that they had signed6 KB (470 words) - 17:35, 26 July 2021
- Benga power station (ICVL) (redirect from Benga Power Plant) (category Coal power stations in Mozambique) (section Massive write-down on Benga Mine causes plant to be dropped)successful in partnering with developers of power plants to take over the mine and burn its thermal coal and, in 2017, decided to restart mining. In 2019, it16 KB (1,937 words) - 19:59, 17 July 2024
- Hwange power station (category Coal power stations in Zimbabwe)of Covid-19. In August 2021, the work was 68% complete. In December 2021, the work was 76% complete and on track for completion in 2022. In April 2022,35 KB (3,714 words) - 23:18, 12 December 2024
- hydropower generating station 2.5 MW solar PV plant in Navrongo 6.54 MW solar PV plant in Lawra 13 MW solar PV plant in Kaleo Moreover, the Bui Power Authority86 KB (9,650 words) - 20:28, 20 June 2024