Stip wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Stip wind farm is a cancelled wind farm in Stip, North Macedonia.
Project Details
Table 1: Phase-level project details for Stip wind farm
Status | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|
Cancelled (inferred October 2021) | 100 MW[1] | Onshore[1] | Samsung Heavy Industries CO LTD (SHI); Korea South-East Power CO LTD; Macedonian government; European Bank for Reconstruction and Development (EBRD)[1] | Samsung Heavy Industries CO LTD (SHI); Korea South-East Power CO LTD[1] |
Location
Table 2: Phase-level location details for Stip wind farm
Location | Coordinates (WGS 84) |
---|---|
Stip, North Macedonia[1] | 41.7375, 22.1936 (approximate)[1] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References