Stipion solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Stipion solar farm is a solar photovoltaic (PV) farm in pre-construction in Štip, Štip Municipality, Eastern Region, North Macedonia.

Project Details

Table 1: Phase-level project details for Stipion solar farm

Status Commissioning year Nameplate capacity Technology Owner
Pre-construction[1] 2024 (planned)[2] 400 MW[3] PV[3] Akuo Energy [100%] (Akuo Energy Greece Α Ε)[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Stipion solar farm

Location Coordinates (WGS 84)
Štip, Štip Municipality, Eastern Region, North Macedonia[2] 41.7375, 22.1936 (approximate)[2]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://web.archive.org/web/20240206150839/https://balkangreenenergynews.com/akuo-to-build-solar-park-of-up-to-400-mw-in-north-macedonia/. Archived from the original on 06 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 https://web.archive.org/web/20240206165315/https://www.energetika.net/eu/novice/envision/french-akuo-to-build-350-400-mw-solar-farm-in-north-macedoni. Archived from the original on 06 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. 3.0 3.1 https://web.archive.org/web/20240201213533/https://balkangreenenergynews.com/kovacevski-north-macedonia-to-add-as-much-as-300-mw-in-solar-power-by-end-2023/. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)