The Su Tu Vang-Rang Dong–Bach Ho-Long Hai–Dinh Co Gas Pipeline is an operating natural gas pipeline.[1]
Location
The pipeline consists of a 26.6-km section from Bach Ho Field to Dinh Co Gas Processing Plant which was commissioned in 1995, a 46.5-km section from Rang Dong-Bach Ho which was commissioned in 2001, and a 43.5-km section from Su Tu Vang to Rang Dong which was commissioned in 2009.[1]
Project Details
- Operator: PetroVietnam[1]
- Owner: PetroVietnam[1]
- Parent company: PetroVietnam[1]
- Capacity: 2.19 billion cubic meters per year[1]
- Length: 116.5 kilometers / 182 miles[1]
- Diameter:
- Status: Operating[1]
- Start year: Phase 1: 1995: Phase 2: 2001; Phase 3: 2009[1]