Sudair Solar PV Project
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Acwa Sudair (Phase 2)
Sudair Solar PV Project (محطة سدير للطاقة الشمسية ٢, محطة سدير للطاقة الشمسية ١) is a solar photovoltaic (PV) farm under construction in Sudair Industrial City, Riyadh, Saudi Arabia.
Project Details
Table 1: Phase-level project details for Sudair Solar PV Project
Phase name | Status | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
1 | Construction[1] | 450 MW[1] | PV[1] | ACWA Power Co [35%]; Water and Electricity Holding CO (Badeel) [35%]; Saudi Aramco Power Co [30%][2][2][2] | ACWA Power; Water and Electricity Holding CO (Badeel); Saudi Aramco Power[2][2][2] |
2 | Construction[3] | 1050 MW[3] | PV[4] | Water and Electricity Holding CO (Badeel) [50%]; ACWA Power Co [50%][5][5] | ACWA Power; Water and Electricity Holding CO (Badeel); Saudi Aramco Power[2][2][2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Sudair Solar PV Project
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Sudair Industrial City, Riyadh, Saudi Arabia[6] | 25.7453, 45.6468 (approximate)[6] |
2 | Sudair Industrial City, Riyadh, Saudi Arabia[6] | 25.7453, 45.6468 (approximate)[6] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 https://web.archive.org/web/20240201140043/https://www.renewableenergymagazine.com/pv_solar/nextracker-selected-for-450-mw-solar-energy-20220328. Archived from the original on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 https://web.archive.org/web/20240206172742/https://www.acwapower.com/news/acwa-power-announces-financial-close-for-1500-mw-sudair-solar-plant-and-aramco-joining-the-consortium-under-pif-renewables-program/. Archived from the original on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20240201140006/https://www.acwapower.com/news/public-investment-fund-pif-reaches-major-milestone-in-landmark-solar-pv-project/. Archived from the original on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240207112928/https://acwapower.com/en/projects/sudair-pv-ipp/. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 5.0 5.1 https://web.archive.org/web/20240201135410/https://attaqa.net/2023/05/21/%D8%A3%D9%83%D9%88%D8%A7-%D8%A8%D8%A7%D9%88%D8%B1-%D8%AA%D9%86%D9%81%D8%B0-3-%D9%85%D8%B4%D8%B1%D9%88%D8%B9%D8%A7%D8%AA-%D9%84%D9%84%D8%B7%D8%A7%D9%82%D8%A9-%D8%A7%D9%84%D8%B4%D9%85%D8%B3%D9%8A%D8%A9/. Archived from the original on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 https://web.archive.org/web/20240206221943/https://www.azpostalcodes.com/sa/place-riyadh-al-majma-ah-hawtat-sudair-sudair-industrial-and-business-city-15346/?page=6. Archived from the original on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)