Sudair Solar PV Project
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Acwa Sudair
Sudair Solar PV Project (محطة سدير للطاقة الشمسية ١, محطة سدير للطاقة الشمسية ٢) is a solar photovoltaic (PV) farm under construction in Sudair Industrial City, Riyadh, Saudi Arabia.
Project Details
Table 1: Phase-level project details for Sudair Solar PV Project
Phase name | Status | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
1 | Construction[1] | 450 MW[1] | PV[1] | ACWA Power [40%]; Water and Electricity Holding CO (Badeel) [35%]; Saudi Aramco Power CO (SAPCO) [35%] (أكواباور)[2] | ACWA Power; Water and Electricity Holding CO (Badeel); Saudi Aramco Power CO (SAPCO) (شركة المياه والكهرباء القابضة "بديل"، ارامكو)[2] |
2 | Construction[3] | 1050 MW[3] | PV[4] | ACWA Power [50%]; Water and Electricity Holding CO (Badeel) [50%] (شركة المياه والكهرباء القابضة "بديل"، ارامكو)[5] | ACWA Power; Water and Electricity Holding CO (Badeel); Saudi Aramco Power CO (SAPCO)[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Sudair Solar PV Project
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Sudair Industrial City, Riyadh, Saudi Arabia[6][3] | 25.7453, 45.6468 (approximate)[7] |
2 | Sudair Industrial City, Riyadh, Saudi Arabia[6][3] | 25.7453, 45.6468 (approximate)[7] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 https://www.renewableenergymagazine.com/pv_solar/nextracker-selected-for-450-mw-solar-energy-20220328.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 https://www.acwapower.com/news/acwa-power-announces-financial-close-for-1500-mw-sudair-solar-plant-and-aramco-joining-the-consortium-under-pif-renewables-program/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 https://www.acwapower.com/news/public-investment-fund-pif-reaches-major-milestone-in-landmark-solar-pv-project/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://acwapower.com/en/projects/sudair-pv-ipp/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://attaqa.net/2023/05/21/%D8%A3%D9%83%D9%88%D8%A7-%D8%A8%D8%A7%D9%88%D8%B1-%D8%AA%D9%86%D9%81%D8%B0-3-%D9%85%D8%B4%D8%B1%D9%88%D8%B9%D8%A7%D8%AA-%D9%84%D9%84%D8%B7%D8%A7%D9%82%D8%A9-%D8%A7%D9%84%D8%B4%D9%85%D8%B3%D9%8A%D8%A9/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 https://www.theasset.com/article/43426/ppas-signed-for-seven-solar-power-projects-in-saudi-arabia.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 https://www.azpostalcodes.com/sa/place-riyadh-al-majma-ah-hawtat-sudair-sudair-industrial-and-business-city-15346/?page=6.
{{cite web}}
: Missing or empty|title=
(help)