Sumatera hydroelectric plant

From Global Energy Monitor
Part of the
Global Hydropower Tracker,
a Global Energy Monitor project.
Report an error

Sumatera hydroelectric plant (PLTA Sumatera pumped storage 1) is an announced hydroelectric power plant in Tuktuk Siadong Village, Simanindo District, Samosir Regency, North Sumatra Province, Indonesia.

Project Details

Table 1: Project details for Sumatera hydroelectric plant

Status Commissioning year Nameplate capacity Turbines Technology type Owner
Announced[1] 2029 (planned)[1] 500 MW[1] 2 x 250 MW[1] Pumped storage[1] PT PLN (Persero)[2]

Location

Table 2: Location details for Sumatera hydroelectric plant

Location Coordinates (WGS 84)
Tuktuk Siadong Village, Simanindo District, Samosir Regency, North Sumatra Province, Indonesia[1] -2.6767, 100.0985 (approximate)[1]

The map below shows the approximate location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 (PDF) https://web.archive.org/web/20211021081234/https://web.pln.co.id/statics/uploads/2021/10/ruptl-2021-2030.pdf. Archived from the original (PDF) on 21 October 2021. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20220813083025/https://www.power-technology.com/marketdata/sumatera-pump-storage-indonesia/. Archived from the original on 13 August 2022. {{cite web}}: Missing or empty |title= (help)