Super Melamchi hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Super Melamchi hydroelectric plant is a hydroelectric power plant in pre-construction in Helambu Village, Helambu Rural Municipality, Sindhupalchok District, Bagmati Province, Nepal.
Project Details
Table 1: Project details for Super Melamchi hydroelectric plant
Status | Nameplate capacity | Technology type | Owner |
---|---|---|---|
Pre-construction[1][2] | 24 MW[3] | Run-of-river[3] | Milarepa Energy Pvt Ltd [100%][4] |
Location
Table 2: Location details for Super Melamchi hydroelectric plant
Location | River | Coordinates (WGS 84) |
---|---|---|
Helambu Village, Helambu Rural Municipality, Sindhupalchok District, Bagmati Province, Nepal[4] | Melamchi Khola River[2] | 28.0032, 85.5319 (approximate)[4] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20230917204345/http://www.doed.gov.np/license/66. Archived from the original on 2023-09-17.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 https://nwrmap.info/hydropower/super-melamchi-hydropower-project.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://www.investopaper.com/news/super-melamchi-hydropower-project/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 https://web.archive.org/web/20221206083000/https://hydro.naxa.com.np/core/datasets/. Archived from the original on 2022-12-06.
{{cite web}}
: Missing or empty|title=
(help)