Suqian power station (国能宿迁三期1XB50MW燃煤背压热电联产项目, 国电宿迁热电) is an operating power station of at least 1320-megawatts (MW) in Yangbei, Sucheng, Suqian, Jiangsu, China with multiple units, some of which are not currently operating. It is also known as Suqian Guodian power station (Phase I Unit 1 & 2), 国电宿迁第二热电公司 (Phase II Unit 3 & 4), 国电宿迁电厂一期 (Phase I Unit 1 & 2).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Suqian power station Yangbei, Sucheng, Suqian, Jiangsu, China 33.839984, 118.36866 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 1: 33.839984, 118.36866

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Phase I Unit 1 retired coal: unknown 135 subcritical 2005 2019
Phase I Unit 2 retired coal: unknown 135 subcritical 2005 2019
Phase II Unit 3 operating coal: unknown 660 ultra-supercritical 2018
Phase II Unit 4 operating coal: unknown 660 ultra-supercritical 2019
Phase III Unit 1 permitted coal: unknown 50 CFB

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase I Unit 1 Guodian Suqian Thermoelectricity Co Ltd [100%] GD POWER Development Co Ltd [29.3%]; Jiangsu Guoxin Investment Group Ltd [22.0%]; China Shenhua Energy Co Ltd [21.7%]; Xuzhou Coal Mining Group Corp [20.0%]; Jiangyin Xinguolian Investment Development Co Ltd [7.0%]
Phase I Unit 2 Guodian Suqian Thermoelectricity Co Ltd [100%] GD POWER Development Co Ltd [29.3%]; Jiangsu Guoxin Investment Group Ltd [22.0%]; China Shenhua Energy Co Ltd [21.7%]; Xuzhou Coal Mining Group Corp [20.0%]; Jiangyin Xinguolian Investment Development Co Ltd [7.0%]
Phase II Unit 3 Guodian Suqian Thermoelectricity Co Ltd [100%] GD POWER Development Co Ltd [29.3%]; Jiangsu Guoxin Investment Group Ltd [22.0%]; China Shenhua Energy Co Ltd [21.7%]; Xuzhou Coal Mining Group Corp [20.0%]; Jiangyin Xinguolian Investment Development Co Ltd [7.0%]
Phase II Unit 4 Guodian Suqian Thermoelectricity Co Ltd [100%] GD POWER Development Co Ltd [29.3%]; Jiangsu Guoxin Investment Group Ltd [22.0%]; China Shenhua Energy Co Ltd [21.7%]; Xuzhou Coal Mining Group Corp [20.0%]; Jiangyin Xinguolian Investment Development Co Ltd [7.0%]
Phase III Unit 1 Guodian Suqian Thermoelectricity Co Ltd [100%] GD POWER Development Co Ltd [29.3%]; Jiangsu Guoxin Investment Group Ltd [22.0%]; China Shenhua Energy Co Ltd [21.7%]; Xuzhou Coal Mining Group Corp [20.0%]; Jiangyin Xinguolian Investment Development Co Ltd [7.0%]

Project-level coal details

  • Permit(s): 苏发改能源发〔2023〕698号[1]

Background

Suqian power station is a 2 x 135 MW coal-fired power plant in Yangbei, Sucheng. It is owned by Guodian Suqian Thermal Power Co. of China's National Energy Investment Group. The units were commissioned in 2005. However, the units were never permitted for construction,[2][3] and were shut down in 2019.[4]

Phase II & III

In 2014, Guodian Suqian Thermal Power Co. proposed a phase II at the power plant of 2 x 660 MW.[5]

The units were permitted in October 2015.[6]

Planet satellite photos from July 2017 to April 2018 show significant construction progress.

Unit 3 was commissioned on December 31, 2018.[7]

Unit 4 was commissioned on June 4, 2019.[8]

Phase III is to build a 50 MW back-pressure cogen unit to supply heat to the Suqian region. The Environmental Impact Assessment report of the project was released for public review in mid-April 2023[9] and passed inspection on 24 May[10] by the Jiang Province Department of Ecology and Environment. Jiangsu Province Development and Reform Commission granted the project permission to build on 28 June 2023 (苏发改能源发〔2023〕698号).[11]

Ownership

On August 28, 2017, China's State-owned Assets Supervision and Administration Commission of the State Council (SASAC) announced that China Guodian Corporation and Shenhua Group will be jointly restructured. Shenhua Group will become China National Energy Investment Group and will absorb China Guodian Corporation. It will be the largest power company in the world by installed capacity, as well as the world's largest coal producer.[12][13] The merger was completed on November 28, 2017.[14]

Articles and Resources

References

  1. https://web.archive.org/web/20240424165148/https://fzggw.jiangsu.gov.cn/art/2023/7/4/art_59371_1056.html. Archived from the original on 24 April 2024. {{cite web}}: Missing or empty |title= (help)
  2. "电企资产证券化持续推进," China Energy News, 2016-12-12
  3. Suqian Powerplant, Enipedia, accessed Dec. 2015.
  4. "权威政策解读,宿迁市政府办公室通知_我苏网," Our Jiangsu, 2019-6-8
  5. Zhu Jin Fang, "国电宿迁公司二期项目获国家能源局“路条”," Polaris power grid news, 2014-12-24
  6. "宿迁公司2×660兆瓦新建燃煤发电项目获核准--系统动态--中国国电集," cgdc.com.cn, Oct 23, 2015
  7. "国家能源集团宿迁发电有限公司3号机组168小时试运行成功," kknews, 2019-01-01
  8. "华东院设计的国家能源集团宿迁电厂66万千瓦二次再热4号机组顺利投产," 发电工程分公司, 2019-06-06
  9. "《国家能源集团宿迁发电有限公司三期1×B50MW燃煤背压热电联产项目环境影响报告书》报批前信息公开". 宿迁24小时. 2023-04-15. Retrieved 2023-8-16. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  10. "省生态环境厅关于国家能源集团宿迁发电有限公司三期1×B50MW燃煤背压热电联产项目环境影响报告书的批复". 江苏省生态环境厅网站. 2023-05-29. Retrieved 2023-8-16. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  11. "苏发改能源发〔2023〕698号". 江苏省发展和改革委员会行政许可和行政处罚信息公示专栏. 2023-07-04. Retrieved 2023-8-16. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  12. "Factbox: Shenhua and Guodian - China's latest state marriage". Reuters. 29 August 2017. Retrieved 30 August 2017.
  13. "China Is Creating the World's Largest Power Company". Bloomberg News. 28 August 2017. Retrieved 29 August 2017.
  14. "China’s Newly-Established National Energy Investment Group Sets World Records in Its Sector, With Assets of Over CNY1.8 Trillion," Yicai Global, 11-28-2017

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.