Suzhou Qianyingzi power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Suzhou Qianyingzi power station (皖能安徽钱营孜发电厂) is an operating power station of at least 1700-megawatts (MW) in Taoyuan Town, Yongqiao District, Suzhou, Anhui, China. It is also known as 皖能安徽钱营孜发电厂二期扩建项目 (Unit 3).
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Suzhou Qianyingzi power station | Taoyuan Town, Yongqiao District, Suzhou, Anhui, China | 33.5107954, 116.9261351 (exact) |
Unit-level coordinates (WGS 84):
- Phase II Unit 3, Unit 1, Unit 2: 33.5107954, 116.9261351
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Phase II Unit 3 | Operating[1] | coal: unknown | 1000 | ultra-supercritical | 2025 |
Unit 1 | Operating | coal: subbituminous | 350 | subcritical | 2018 |
Unit 2 | Operating | coal: subbituminous | 350 | subcritical | 2018 |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Phase II Unit 3 | Anhui Qianyingzi Power Generation Co Ltd [100%] | An Hui Wenergy Co Ltd [50.0%]; unknown [22.5%]; Anhui Wanbei Coal and Electricity Group Co Ltd [16.8%]; Anhui Province Energy Group Co Ltd [10.7%] |
Unit 1 | Anhui Qianyingzi Power Generation Co Ltd [100%] | An Hui Wenergy Co Ltd [50.0%]; unknown [22.5%]; Anhui Wanbei Coal and Electricity Group Co Ltd [16.8%]; Anhui Province Energy Group Co Ltd [10.7%] |
Unit 2 | Anhui Qianyingzi Power Generation Co Ltd [100%] | An Hui Wenergy Co Ltd [50.0%]; unknown [22.5%]; Anhui Wanbei Coal and Electricity Group Co Ltd [16.8%]; Anhui Province Energy Group Co Ltd [10.7%] |
Background on Project
In 2016, the two-unit, 700 MW coal plant was under construction and planned for commissioning in 2017. It was sponsored by Wanbei Coal-Electricity Group and Wenergy Group.[2]
Plant postponed by July 2017 suspension
In July 2017, the NEA released the "Guideline of Supply-Side Reform of the Coal Power Bubble". The Guideline included a draft list which slowed down or halted 185 coal-burning units across 21 provinces, totaling 107 GW. 114 coal units (65 GW) are ordered to slow down the construction progress during 2017 to 2020, and are not allowed to connect to the grid in 2017. In addition, 71 coal units (42 GW) were halted indefinitely for regulation violations. The list partly overlapped with the projects listed in the January NEA letter to 13 provinces.[3]
Suzhou Qianyingzi power station Units 1-2 are among the postponed coal-burning units,[3] and also appeared on an updated list of postponements released in September 2017.[4]
For more information, see China's 2016/2017 Restrictions on Development of Coal-Fired Power Capacity.
2018 development
Unit 1 was reported as commissioned in April 2018.[5]
Satellite photographs from July 2017 and March 2018 show that Unit 2 continued construction and appeared to be substantially complete in March 2018.[6]
Unit 2 was commissioned in August 2018.[7]
Expansion
A third unit was permitted on September 19, 2022.[8][9]
The construction ceremony was held on December 28, 2022.[10]
In 2023, the project was on Anhui's key projects list as continuing construction, and a project supervision bid was awarded to Shanghai Electric Power Supervision Consulting Co., Ltd. in March 2023.[11]
In May 2023, concrete pouring reportedly marked the official start of construction.[12] The power station was expected by 2024.
Articles and Resources
References
- ↑ https://news.bjx.com.cn/html/20250331/1434569.shtml.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "宿州钱营孜2×350MW低热值煤发电工程1号锅炉钢架按节点目标计划准时开吊," March 30, 2016
- ↑ 3.0 3.1 "16部委联合发文防范化解煤电产能过剩风险," Sohu.com, 2017-08-03
- ↑ "2017年分省煤电停建和缓建项目名单," Sohu, 2017-10-12
- ↑ "宿州钱营孜1号机组完成168小时试运行," CEEG, 2018-04-30
- ↑ Comparison of 33.5107954, 116.9261351 in July 2017 and March 2018, Planet, May 2018
- ↑ "中国能建总承包宿州钱营孜低热值煤发电工程2号机组通过168试运," CEC, 2018-08-14
- ↑ "1000MW!安徽钱营孜发电有限公司二期扩建项目核准前公示," BJX, 2022-09-07
- ↑ "钱营孜发电公司二期扩建项目获得省发改委核准," WBMD, 2022-09-22
- ↑ "杨林出席钱营孜电厂二期扩建项目开工动员会并致辞," WBMD, 2022-12-28
- ↑ "安徽钱营孜发电有限公司二期扩建项目1×1000MW燃煤发电工程监理中标结果公示," BJX, 2023-03
- ↑ "1000MW!安徽宿州钱营孜电厂二期扩建项目开工," BJX, 2023-05-30