Syama Hybrid solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Syama Hybrid Pv
Syama Hybrid solar farm is a solar photovoltaic (PV) farm in Kadiolo Cercle, Sikasso, Mali.
Project Details
Table 1: Phase-level project details for Syama Hybrid solar farm
Status | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|
Shelved (inferred August 2023) | 20 MWp/dc[1] | PV[2] | Resolute Mining [100%][1] | Aggreko[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Syama Hybrid solar farm
Location | Coordinates (WGS 84) |
---|---|
Kadiolo Cercle, Sikasso, Mali[3] | 10.7938, -6.0699 (exact)[3] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 https://web.archive.org/web/20220311174251/https://www.miningreview.com/energy/mining-industry-decarbonises-through-hybrid-energy-solutions/. Archived from the original on 11 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240207084118/https://www.afrik21.africa/en/mali-resolute-will-equip-its-syama-gold-mine-with-a-hybrid-of-grid-thanks-to-aggreko/. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 3.0 3.1 https://www.google.com/maps/place/Syama+Gold+Mine/@10.7898035-6.10556613932m/data=!3m1!1e3!4m5!3m4!1s0xe4b477e5f818b33:0x5f44f34d88efc0cf!8m2!3d10.7898035!4d-6.0705471.
{{cite web}}
: Missing or empty|title=
(help)