TBD Guajaibón solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
TBD Guajaibón solar farm (Parque de Energía Solar Fotovoltaica TBD Guajaibón) is an operating solar photovoltaic (PV) farm in Artemisa, Cuba.
Project Details
Table 1: Phase-level project details for TBD Guajaibón solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|---|
1 | Operating[1] | 2023[1] | 23 MW[1] | PV[1] | Thai Binh Green Power Investment Corp [100%][1] |
future phases | Pre-construction[1] | – | 127 MW[1] | PV[1] | Thai Binh Green Power Investment Corp [100%][1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for TBD Guajaibón solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Artemisa, Cuba[1] | 23.0038, -82.7876 (approximate)[1] |
future phases | Artemisa, Cuba[1] | 23.0038, -82.7876 (approximate)[1] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References