TOPP2 geothermal power plant
From Global Energy Monitor
This article is part of the Global Geothermal Power Tracker, a Global Energy Monitor project. |
TOPP2 geothermal power plant is a geothermal power plant in pre-construction in New Zealand.
Project Details
Table 1: Unit-level project details for TOPP2 geothermal power plant
Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|
Pre-construction[1] | 2027 (planned)[2] | 49 MW[1] | Binary cycle[3] | Eastland Generation[1] |
Location
Table 2: Unit-level location details for TOPP2 geothermal power plant
Location | Coordinates (WGS 84) |
---|---|
New Zealand | -38.08302077424844, 176.7278181716876 (approximate) |
The map below shows the approximate location of the geothermal power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global geothermal power plants, a downloadable dataset, and summary data, please visit the Global Geothermal Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 https://web.archive.org/web/20240415202357/https://eastlandgeneration.nz/renewable-generation/geothermal/. Archived from the original on 15 April 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240415215223/https://www.thinkgeoenergy.com/eastland-secures-25m-long-term-loan-to-construct-and-upgrade-geothermal-assets/. Archived from the original on 15 April 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20221108130549/http://thinkgeoenergy.com/map. Archived from the original on 08 November 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)