TOPP2 geothermal power plant

From Global Energy Monitor
This article is part of the
Global Geothermal Power Tracker, a Global Energy Monitor project.
Report an error

TOPP2 geothermal power plant is a geothermal power plant in pre-construction in New Zealand.

Project Details

Table 1: Unit-level project details for TOPP2 geothermal power plant

Status Commissioning year Nameplate capacity Technology Owner
Pre-construction[1] 2027 (planned)[2] 49 MW[1] Binary cycle[3] Eastland Generation[1]

Location

Table 2: Unit-level location details for TOPP2 geothermal power plant

Location Coordinates (WGS 84)
New Zealand -38.08302077424844, 176.7278181716876 (approximate)

The map below shows the approximate location of the geothermal power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global geothermal power plants, a downloadable dataset, and summary data, please visit the Global Geothermal Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 https://web.archive.org/web/20240415202357/https://eastlandgeneration.nz/renewable-generation/geothermal/. Archived from the original on 15 April 2024. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20240415215223/https://www.thinkgeoenergy.com/eastland-secures-25m-long-term-loan-to-construct-and-upgrade-geothermal-assets/. Archived from the original on 15 April 2024. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20221108130549/http://thinkgeoenergy.com/map. Archived from the original on 08 November 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)