Taichung-Wuxi Gas Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

The Taichung-Wuxi Gas Pipeline 臺中-烏溪輸氣管線 is a natural gas pipeline under construction in Taiwan.[1]

Location

The pipeline runs from the Taichung LNG Terminal in Taichung Harbor to the Wuxi measuring station.

Loading map...

Project details

  • Operator: CPC
  • Parent company: CPC
  • Capacity: 287 million cubic feet per day
  • Length: 21.8 kilometers
  • Diameter: 26 inches
  • Status: Construction
  • Start year: 2021

Background

The pipeline is operated and owned by CPC.[1] According to CPC the pipeline was under construction as of August 2019 and was scheduled for completion in late 2019.[2]

As of December 2021, there was no evidence for further development of the pipeline, so the start year is presumed to be 2022 at the earliest.

Articles and resources

References

  1. 1.0 1.1 Global Operations, CPC, accessed October 2018
  2. DOWNSTREAM OPERATIONS, CPC Corporation, August 2019.

Related GEM.wiki articles

External resources

External articles