Taichung-Wuxi Gas Pipeline
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
The Taichung-Wuxi Gas Pipeline 臺中-烏溪輸氣管線 is a natural gas pipeline under construction in Taiwan.[1]
Location
The pipeline runs from the Taichung LNG Terminal in Taichung Harbor to the Wuxi measuring station.
Project details
- Operator: CPC
- Parent company: CPC
- Capacity: 287 million cubic feet per day
- Length: 21.8 kilometers
- Diameter: 26 inches
- Status: Construction
- Start year: 2021
Background
The pipeline is operated and owned by CPC.[1] According to CPC the pipeline was under construction as of August 2019 and was scheduled for completion in late 2019.[2]
As of December 2021, there was no evidence for further development of the pipeline, so the start year is presumed to be 2022 at the earliest.
Articles and resources
References
- ↑ 1.0 1.1 Global Operations, CPC, accessed October 2018
- ↑ DOWNSTREAM OPERATIONS, CPC Corporation, August 2019.