Taichung (TaiPower) LNG Terminal

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Taichung (TaiPower) LNG Terminal (台電第五接收站,簡稱五接), also known as No. 5 LNG Terminal, is a proposed LNG terminal in Taichung Harbour, Taiwan.[1]

Location

Loading map...

Project details

  • Owner: TaiPower[1] (Taiwan Power Company)
  • Parent company: TaiPower
  • Location: Taichung Harbour, Taiwan[1]
  • Coordinates: 24.291471, 120.510622 (approximate)
  • Type: Import[1]
  • Capacity: 3 mtpa[2]
  • Status: Proposed[1]
  • Start year: 2025[3]
    • Originally 2023[1]

Note: mtpa = million tonnes per year; bcfd = billion cubic feet per day

Background

The terminal appears to have been proposed as early as 2017.[4] [5]

State-owned utility Taiwan Power Company (Taipower) expects to start its first imports of liquefied natural gas (LNG) in 2023. Taipower’s first imports would mean that state-run CPC Corporation would lose its status as Taiwan’s sole LNG importer. Taipower, which consumes about two-thirds of the LNG imported by the island, first obtained government permission to source the fuel from international markets in 2014. The new fuel supply will feed into Taipower’s planned gas-fired power plant at Taichung, where the first unit is expected to be ready by September 2023.[1]

The project couldn't pass the EIA inspection due to the location of the special LNG jetty is on the key area of a protected marine mammal Taiwan white dolphin.[6]

By January 2023, the EIA inspection is still pending. [7]

As of February 2024, no progress could be heard.[8]

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 Taipower expects to start LNG imports from 2023, Gas Processing News, accessed April 19, 2021
  2. Tim Daiss, The Small Asian Nation With Big LNG Plans, OilPrice.com, March 13, 2019
  3. "Infrastructure expansion delay challenges Taiwan's 2025 gas ambitions". IHS Markit. 2021-07-09. Retrieved 2022-06-28.
  4. "中火新燃氣機組、第五接收站 提前2023年完工--環境資訊中心". 2017-12-07.{{cite web}}: CS1 maint: url-status (link)
  5. Jessica Jaganathan. "Taipower expects to start LNG imports from 2023". U.S. Retrieved 2023-02-15.
  6. "白海豚存亡關鍵 台中港五接堤防環評起跑-- 焦點事件記者王子豪報導". eventsinfocus.org. 2021-03-31. {{cite web}}: line feed character in |title= at position 22 (help)CS1 maint: url-status (link)
  7. "【燃氣危機2-1】新市長反對加上中油鬥台電 四、五接興建添變數" (in 中文). 2021-01-09.
  8. "天然氣接收站預計蓋7座、台灣海岸恐水泥化". Hami書城。快讀 (in 中文(臺灣)). 2023-05-02. Retrieved 2024-02-16.{{cite web}}: CS1 maint: url-status (link)

Related GEM.wiki articles

External resources

External articles