Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Taizhou power station (国电泰州发电厂) is an operating power station of at least 4000-megawatts (MW) in Yong'anzhou, Gaogang, Taizhou, Jiangsu, China.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Taizhou power station | Yong'anzhou, Gaogang, Taizhou, Jiangsu, China | 32.187206, 119.914444 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4: 32.187206, 119.914444
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Phase I Unit 1 | operating | coal: bituminous | 1000 | ultra-supercritical | 2007 |
Phase I Unit 2 | operating | coal: bituminous | 1000 | ultra-supercritical | 2009 |
Phase II Unit 3 | operating | coal: bituminous | 1000 | ultra-supercritical | 2015 |
Phase II Unit 4 | operating | coal: bituminous | 1000 | ultra-supercritical | 2016 |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Phase I Unit 1 | State Energy Group Taizhou Power Generation Co Ltd [100%] | Jiangsu Guoxin Investment Group Ltd [37.8%]; GD POWER Development Co Ltd [24.5%]; China Shenhua Energy Co Ltd [18.1%]; Jiangsu Chunlan Refrigerating Equipment Stock Co Ltd [10.0%]; Jiangsu Communications Holdings Co Ltd [4.9%]; other [4.6%] |
Phase I Unit 2 | State Energy Group Taizhou Power Generation Co Ltd [100%] | Jiangsu Guoxin Investment Group Ltd [37.8%]; GD POWER Development Co Ltd [24.5%]; China Shenhua Energy Co Ltd [18.1%]; Jiangsu Chunlan Refrigerating Equipment Stock Co Ltd [10.0%]; Jiangsu Communications Holdings Co Ltd [4.9%]; other [4.6%] |
Phase II Unit 3 | State Energy Group Taizhou Power Generation Co Ltd [100%] | Jiangsu Guoxin Investment Group Ltd [37.8%]; GD POWER Development Co Ltd [24.5%]; China Shenhua Energy Co Ltd [18.1%]; Jiangsu Chunlan Refrigerating Equipment Stock Co Ltd [10.0%]; Jiangsu Communications Holdings Co Ltd [4.9%]; other [4.6%] |
Phase II Unit 4 | State Energy Group Taizhou Power Generation Co Ltd [100%] | Jiangsu Guoxin Investment Group Ltd [37.8%]; GD POWER Development Co Ltd [24.5%]; China Shenhua Energy Co Ltd [18.1%]; Jiangsu Chunlan Refrigerating Equipment Stock Co Ltd [10.0%]; Jiangsu Communications Holdings Co Ltd [4.9%]; other [4.6%] |
Background
The two existing coal-fired units of Taizhou power station, totaling 2,000 MW, were brought online between 2007 and 2009. The plant was originally owned by China Guodian.[1][2] [3]
Description of Expansion
Guodian is currently building two additional coal-fired units at this plant, Units 3-4, with a total planned capacity of 2,000 MW. The new units are scheduled to be completed in 2015.[3][4]
Unit 3 was completed in September 2015.[5] Unit 4 was completed in 2016.[6]
Ownership
On August 28, 2017, China's State-owned Assets Supervision and Administration Commission of the State Council (SASAC) announced that China Guodian Corporation and Shenhua Group will be jointly restructured. Shenhua Group will become China National Energy Investment Group and will absorb China Guodian Corporation. It will be the largest power company in the world by installed capacity, as well as the world's largest coal producer.[7][8] The merger was completed on November 28, 2017.[9]
Carbon Capture, Utilization, and Storage facility
In June 2023, it was reported that China Energy had commissioned a carbon capture, utilization, and storage (CCUS) facility at the Taizhou power station. According to China Energy, the facility was expected to capture 500,000 tonnes of carbon dioxide a year. As of June 2023, it was Asia’s largest CCUS project in the coal-fired power sector, and the third largest in the world.[10][11][12]
Plant Details for Existing Phase I
- Sponsor: Guodian Taizhou Generating Co
- Parent company: National Energy Investment Group
- Location: Yong'anzhou, Gaogang District, Taizhou Prefecture, Jiangsu Province, China
- Coordinates: 32.1872059, 119.9144442 (exact)
- Status: Operating
- Gross capacity: 2,000 MW (Units 1 & 2: 1,000 MW)
- Type: Ultra-Supercritical
- In service: 2007 (Unit 1); 2009 (Unit 2)
- Coal type:
- Coal source:
- Source of financing:
Articles and Resources
References
- ↑ "国电泰州电厂二期工程奠基", 泰州新闻网, 2012-09-20
- ↑ "国电泰州电厂二期展开环评", 泰州新闻网, 2013-04-17
- ↑ 3.0 3.1 Ailun Yang and Yiyun Cui, "Global Coal Risk Assessment: Data Analysis and Market Research," World Resources Institute working paper, November 2012
- ↑ "锅炉还是那个锅炉 国电泰州电厂如何实现超低排放?" Polaris power grid News, 2015/5/18
- ↑ "国电泰州电厂二期工程3号机组建成投产," 泰州日报, 2015年09月26
- ↑ "华东院公司设计的国电泰州电厂二期工程百万千瓦二次再热4号机组投产创世界发电煤耗最低水平," CPECC, 2016-01-14
- ↑ "Factbox: Shenhua and Guodian - China's latest state marriage". Reuters. 29 August 2017. Retrieved 30 August 2017.
- ↑ "China Is Creating the World's Largest Power Company". Bloomberg News. 28 August 2017. Retrieved 29 August 2017.
- ↑ "China’s Newly-Established National Energy Investment Group Sets World Records in Its Sector, With Assets of Over CNY1.8 Trillion," Yicai Global, 11-28-2017
- ↑ "Chinese energy giant strives for carbon neutrality, launches mega carbon capture project," CGTN, June 3, 2023
- ↑ "亚洲最大煤电碳捕集利用封存项目在泰州投产," BJX, 2023-06-03
- ↑ "国家能源集团江苏泰州公司50万吨CCUS项目: 打造煤电“双碳”样板," BJX, 2023-06-05
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.