Talaipalli Coal Mine is an operating coal mine in Gharghoda, Raigarh, Chhattisgarh, India.

Location

Table 1: Project-level location details

Mine Name Location Coordinates (WGS 84)
Talaipalli Coal Mine Gharghoda, Raigarh, Chhattisgarh, India 22.17758, 83.355201 (exact)

The map below shows the exact location of the coal mine:

Loading map...

Project Details

Table 2: Project status

Status Status Detail Opening Year Closing Year
Operating[1] 2019[1]

Table 3: Operation details

Note: The asterisk (*) signifies that the value is a GEM estimated figure.
Capacity (Mtpa) Production (Mtpa) Year of Production Mine Type Mining Method Mine Size (km2) Mine Depth (m) Workforce Size
2[2] 2.4[3] 2022[3] Underground & Surface Mixed 23.49 60* 908*

Table 4: Coal resources and destination

Total Reserves (Mt) Year of Total Reserves Recorded Total Resources (Mt) Coalfield Coal Type Coal Grade Primary Consumer/ Destination
843.68 1267 Mand-Raigarh Subbituminous Thermal Lara Integrated Thermal Power Project

Table 5: Ownership and parent company

Owner Parent Company Headquarters
NTPC Ltd[4] NTPC Ltd [100%] India

Table 6: Historical production (unit: million tonnes per annum)

ROM or Saleable 2017 2018 2019 2020 2021 2022 2023
ROM 0[1] 0[1] 0[3] 2[3] 7[5]

Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September supplement.

Background on Mine

The Talaipalli coal mine Project of 18 MTPA OC and 0.72 MTPA of UG capacity on a mining lease area of 2349.35 ha operated by National Thermal Power Corporation Limited is located in Tehsil Gharghoda, District Raigarh, State Chhattisgarh, India. The mine was allocated to NTPC for its captive plant Lara Super Thermal Power Project of 4800 MW and the environment clearance granted for its development on 2 January, 2013. [6]

The coal mine was cancelled by the Supreme Court on 24 September 2014 in the wake of coalgate scandal[7] and reallocated to NTPC on 28 October 2015.[6]

Expansion Details

  • Status:
  • Size of Expansion:
  • Permits and Applications:

Articles and Resources

Additional data

To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 (PDF) https://www.ntpc.co.in/sites/default/files/annual-report/complete-reports/NTPC_Annual%20Report_20-21.pdf. {{cite web}}: Missing or empty |title= (help)
  2. (PDF) https://web.archive.org/web/20240125230149/https://coal.gov.in/sites/default/files/2023-06/opt/Minutes-of-Meeting-held-on4112022.pdf. Archived from the original (PDF) on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 (PDF) https://web.archive.org/web/20240125084422/https://www.ntpc.co.in/sites/default/files/annual-report/complete-reports/47th%20Annual%20Report%20of%20NTPC%202022-2023%20New.pdf. Archived from the original (PDF) on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. https://web.archive.org/web/20240723001903/https://ntpc.co.in/index.php/investors/annual-reports/2021-22. Archived from the original on 23 July 2024. {{cite web}}: Missing or empty |title= (help)
  5. (PDF) https://web.archive.org/web/20240716152817/https://coal.gov.in/sites/default/files/2023-06/MoM08042024.pdf. Archived from the original (PDF) on 16 July 2024. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 Environment Clearance for Talaipalli coal mine Project, MoEF&CC India, 2 January, 2013
  7. Order of the Supreme Court of India regarding allocation of coal blocks, 24/09/2014, India Environment Portal, 24 Septembr 2014, acccessed on April 7, 2020