Talaipalli Coal Mine is an operating coal mine in Gharghoda, Raigarh, Chhattisgarh, India.
Location
Table 1: Project-level location details
Mine Name | Location | Coordinates (WGS 84) |
---|---|---|
Talaipalli Coal Mine | Gharghoda, Raigarh, Chhattisgarh, India | 22.17758, 83.355201 (exact) |
The map below shows the exact location of the coal mine:
Project Details
Table 2: Project status
Status | Status Detail | Opening Year | Closing Year |
---|---|---|---|
Operating[1] | – | 2019[1] | – |
Table 3: Operation details
Capacity (Mtpa) | Production (Mtpa) | Year of Production | Mine Type | Mining Method | Mine Size (km2) | Mine Depth (m) | Workforce Size |
---|---|---|---|---|---|---|---|
2[2] | 2.4[3] | 2022[3] | Underground & Surface | Mixed | 23.49 | 60* | 908* |
Table 4: Coal resources and destination
Total Reserves (Mt) | Year of Total Reserves Recorded | Total Resources (Mt) | Coalfield | Coal Type | Coal Grade | Primary Consumer/ Destination |
---|---|---|---|---|---|---|
843.68 | – | 1267 | Mand-Raigarh | Subbituminous | Thermal | Lara Integrated Thermal Power Project |
Table 5: Ownership and parent company
Owner | Parent Company | Headquarters |
---|---|---|
NTPC Ltd[4] | NTPC Ltd [100%] | India |
Table 6: Historical production (unit: million tonnes per annum)
ROM or Saleable | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 |
---|---|---|---|---|---|---|---|
ROM | – | – | 0[1] | 0[1] | 0[3] | 2[3] | 7[5] |
Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September supplement.
Background on Mine
The Talaipalli coal mine Project of 18 MTPA OC and 0.72 MTPA of UG capacity on a mining lease area of 2349.35 ha operated by National Thermal Power Corporation Limited is located in Tehsil Gharghoda, District Raigarh, State Chhattisgarh, India. The mine was allocated to NTPC for its captive plant Lara Super Thermal Power Project of 4800 MW and the environment clearance granted for its development on 2 January, 2013. [6]
The coal mine was cancelled by the Supreme Court on 24 September 2014 in the wake of coalgate scandal[7] and reallocated to NTPC on 28 October 2015.[6]
Expansion Details
- Status:
- Size of Expansion:
- Permits and Applications:
Articles and Resources
Additional data
To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 (PDF) https://www.ntpc.co.in/sites/default/files/annual-report/complete-reports/NTPC_Annual%20Report_20-21.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240125230149/https://coal.gov.in/sites/default/files/2023-06/opt/Minutes-of-Meeting-held-on4112022.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 (PDF) https://web.archive.org/web/20240125084422/https://www.ntpc.co.in/sites/default/files/annual-report/complete-reports/47th%20Annual%20Report%20of%20NTPC%202022-2023%20New.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240723001903/https://ntpc.co.in/index.php/investors/annual-reports/2021-22. Archived from the original on 23 July 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240716152817/https://coal.gov.in/sites/default/files/2023-06/MoM08042024.pdf. Archived from the original (PDF) on 16 July 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 Environment Clearance for Talaipalli coal mine Project, MoEF&CC India, 2 January, 2013
- ↑ Order of the Supreme Court of India regarding allocation of coal blocks, 24/09/2014, India Environment Portal, 24 Septembr 2014, acccessed on April 7, 2020