Talinque solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Talinque solar farm (Parque Solar Talinque) is a solar photovoltaic (PV) farm under construction in Municipio de Tamanique, Departamento de La Libertad, El Salvador.

Project Details

Table 1: Phase-level project details for Talinque solar farm

Status Commissioning year Nameplate capacity Technology Owner
Construction[1] 2023 (planned)[1] 17 MWp/dc[1] PV[1] Comisión Ejecutiva Hidroeléctrica del Río Lempa [100%][2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Talinque solar farm

Location Coordinates (WGS 84)
Municipio de Tamanique, Departamento de La Libertad, El Salvador[1] 13.5962, -89.4173 (approximate)[1]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20240201170806/https://www.pv-magazine-latam.com/2022/11/02/el-salvador-arranca-la-construccion-de-su-primera-planta-fotovoltaica-estatal/. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. https://web.archive.org/web/20240206193335/https://www.pv-magazine.com/2022/11/02/construction-begins-on-el-salvadors-first-state-owned-solar-park/. Archived from the original on 06 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)