Talinque solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Talinque solar farm (Parque Solar Talinque) is an operating solar photovoltaic (PV) farm in Municipio de Tamanique, Departamento de La Libertad, El Salvador.
Project Details
Table 1: Phase-level project details for Talinque solar farm
Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|
Operating[1] | 2023[1] | 17 MWp/dc[2] | PV[2] | Comisión Ejecutiva Hidroeléctrica del Río Lempa [100%][3] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Talinque solar farm
Location | Coordinates (WGS 84) |
---|---|
Municipio de Tamanique, Departamento de La Libertad, El Salvador[2] | 13.5962, -89.4173 (approximate)[2] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://web.archive.org/web/20250108034318/https://elsalvadorinenglish.com/2023/12/20/el-salvador-illuminates-the-future-with-talnique-its-first-state-owned-photovoltaic-plant/. Archived from the original on 2025-01-08.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 https://web.archive.org/web/20240201170806/https://www.pv-magazine-latam.com/2022/11/02/el-salvador-arranca-la-construccion-de-su-primera-planta-fotovoltaica-estatal/. Archived from the original on 2024-02-01.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240206193335/https://www.pv-magazine.com/2022/11/02/construction-begins-on-el-salvadors-first-state-owned-solar-park/. Archived from the original on 2024-02-06.
{{cite web}}
: Missing or empty|title=
(help)