Tambak Lorok power station

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Tambak Lorok power station is an operating power station of at least 1334-megawatts (MW) in Tanjung Mas, Central Java, Indonesia with multiple units, some of which are not currently operating. It is also known as Semarang Generation Unit, Semarang GBU, Jawa-Bali 1.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Tambak Lorok power station Tanjung Mas, Central Java, Indonesia -6.9505, 110.434 (exact)[1]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit CC1, Unit CC2, Unit CC3, Unit ST1, Unit ST2, Unit ST3: -6.9505, 110.434

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Retired year
Unit CC1 operating[2][3] fossil gas - natural gas, fossil liquids - fuel oil[4] 517[5] combined cycle[5] 1993[4]
Unit CC2 operating[2][3] fossil gas - natural gas, fossil liquids - fuel oil[4] 517[5] combined cycle[5] 1997[5]
Unit CC3 construction[6][7] fossil gas - natural gas[8] 780[9] combined cycle[8]
Unit ST1 operating[4][3] fossil liquids - fuel oil[4] 50[4] steam turbine[4]
Unit ST2 operating[4][3] fossil liquids - fuel oil[4] 50[4] steam turbine[4]
Unit ST3 operating[4][3] fossil liquids - fuel oil[4] 200[4] steam turbine[4]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner
Unit CC1 PT Indonesia Power [100.0%]
Unit CC2 PT Indonesia Power [100.0%]
Unit CC3 PT Indonesia Power [100.0%]
Unit ST1 PT Indonesia Power [100.0%]
Unit ST2 PT Indonesia Power [100.0%]
Unit ST3 PT Indonesia Power [100.0%]

Articles and Resources

References

  1. https://web.archive.org/web/20230103182122/https://datasets.wri.org/dataset/globalpowerplantdatabase. Archived from the original on 03 January 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 (PDF) https://web.archive.org/web/20211027070334/https://indonesiapower.co.id/id/komunikasi-berkelanjutan/Reports/STATISTIC%20REPORT%20PT%20INDONESIA%20POWER%20TAHUN%202020.pdf. Archived from the original (PDF) on 27 October 2021. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 (PDF) https://web.archive.org/web/20211021081234/https://web.pln.co.id/statics/uploads/2021/10/ruptl-2021-2030.pdf. Archived from the original (PDF) on 21 October 2021. {{cite web}}: Missing or empty |title= (help)
  4. 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 4.11 4.12 4.13 4.14 (PDF) https://web.archive.org/web/20221226150403/https://repit.files.wordpress.com/2013/03/gbu-ip-semarang1.pdf. Archived from the original (PDF) on 26 December 2022. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 5.4 (PDF) https://web.archive.org/web/20221224153843/https://openjicareport.jica.go.jp/pdf/11838976_02.pdf. Archived from the original (PDF) on 24 December 2022. {{cite web}}: Missing or empty |title= (help)
  6. https://web.archive.org/web/20221226150411/https://www.nsenergybusiness.com/projects/tambak-lorok-combined-cycle-power-plant-block-3/. Archived from the original on 26 December 2022. {{cite web}}: Missing or empty |title= (help)
  7. https://web.archive.org/web/20210310233844/https://semarang.bisnis.com/read/20190320/536/902276/pembangunan-pltgu-blok-3-tambak-lorok-mencapai-20-persen. Archived from the original on 10 March 2021. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 https://web.archive.org/web/20221010125112/https://www.genewsroom.com/press-releases/indonesia-power-awards-ge-marubeni-and-hutama-karya-consortium-epc-contract-tambak. Archived from the original on 10 October 2022. {{cite web}}: Missing or empty |title= (help)
  9. https://web.archive.org/web/20210310215839/https://www.ge.com/reports/celebrating-no-lost-time-injury-across-the-asean-region/. Archived from the original on 10 March 2021. {{cite web}}: Missing or empty |title= (help)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.