Tamor Mewa hydroelectric plant

From Global Energy Monitor
Part of the
Global Hydropower Tracker,
a Global Energy Monitor project.
Report an error

Tamor Mewa hydroelectric plant (तमोर–मेवा जलविद्युत आयोजना) is a hydroelectric power plant in pre-construction in Phungthapla Village, Aathrai Tribeni Rural Municipality, Taplejung District, Province No. 1 Province, Nepal.

Project Details

Table 1: Project details for Tamor Mewa hydroelectric plant

Status Commissioning year Nameplate capacity Turbines Technology type Owner Operator
Pre-construction[1] 2028 (planned)[1] 128 MW[2] 3 x 42.6 MW[2] Run-of-river[2] Spark Hydroelectric CO LTD[2] Spark Hydroelectric CO LTD[2]

Location

Table 2: Location details for Tamor Mewa hydroelectric plant

Location River Coordinates (WGS 84)
Phungthapla Village, Aathrai Tribeni Rural Municipality, Taplejung District, Province No. 1 Province, Nepal[2] Tamor River[3] 27.3333, 87.5833 (approximate)[2]

The map below shows the approximate location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://web.archive.org/web/20231020095847/https://myrepublica.nagariknetwork.com/news/128-mw-tamor-mewa-hydroelectric-project-to-be-built-1/. Archived from the original on 20 October 2023. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 https://web.archive.org/web/20221209063301/http://www.sparkhydro.com/tamor-mewa-hydroelectric-project. Archived from the original on 09 December 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. https://nwrmap.info/hydropower/tamor-mewa-hydropower-project. {{cite web}}: Missing or empty |title= (help)