Tamor Mewa hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Tamor Mewa hydroelectric plant (तमोर–मेवा जलविद्युत आयोजना) is a hydroelectric power plant in pre-construction in Phungthapla Village, Aathrai Tribeni Rural Municipality, Taplejung District, Province No. 1 Province, Nepal.
Project Details
Table 1: Project details for Tamor Mewa hydroelectric plant
Status | Commissioning year | Nameplate capacity | Turbines | Technology type | Owner | Operator |
---|---|---|---|---|---|---|
Pre-construction[1] | 2028 (planned)[1] | 128 MW[2] | 3 x 42.6 MW[2] | Run-of-river[2] | Spark Hydroelectric CO LTD[2] | Spark Hydroelectric CO LTD[2] |
Location
Table 2: Location details for Tamor Mewa hydroelectric plant
Location | River | Coordinates (WGS 84) |
---|---|---|
Phungthapla Village, Aathrai Tribeni Rural Municipality, Taplejung District, Province No. 1 Province, Nepal[2] | Tamor River[3] | 27.3333, 87.5833 (approximate)[2] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://web.archive.org/web/20231020095847/https://myrepublica.nagariknetwork.com/news/128-mw-tamor-mewa-hydroelectric-project-to-be-built-1/. Archived from the original on 20 October 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 https://web.archive.org/web/20221209063301/http://www.sparkhydro.com/tamor-mewa-hydroelectric-project. Archived from the original on 09 December 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://nwrmap.info/hydropower/tamor-mewa-hydropower-project.
{{cite web}}
: Missing or empty|title=
(help)