Tanah Laut wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Tanah Laut wind farm (PLTB Tanah Laut) is a wind farm in pre-construction in Pelaihari, South Kalimantan, Indonesia.

Project Details

Table 1: Phase-level project details for Tanah Laut wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner
1 Pre-construction[1] 2025 (planned)[1] 70 MW[2] Onshore[2] Pace Energy PVT LTD; PT Juvisk Tri Swarna[3]
2 Announced[4] 20 MW[2] Onshore[2] Pace Energy PVT LTD; PT Juvisk Tri Swarna[3]
3 Cancelled (inferred June 2023) 60 MW[2] Onshore[2] Pace Energy PVT LTD; PT Juvisk Tri Swarna[3]

Location

Table 2: Phase-level location details for Tanah Laut wind farm

Phase Name Location Coordinates (WGS 84)
1 Pelaihari, South Kalimantan, Indonesia[3] -3.8016, 114.7745 (approximate)[5]
2 South Kalimantan, Indonesia[2] -3.5752, 114.7283 (approximate)[2]
3 South Kalimantan, Indonesia[2] -3.5752, 114.7283 (approximate)[2]

The map below shows the approximate locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 (PDF) https://www.total-eren.com/wp-content/uploads/2023/05/Press-Release_PPA-Tanah-Laut-_English_04052023_V2-final-1.pdf. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 https://ebtke.esdm.go.id/post/2018/02/01/1872/selain.sidrap.berikut.pembangkit.listrik.tenaga.angin.yang.ditargetkan.segera.beroperasi?lang=en. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 https://www.esdm.go.id/id/berita-unit/direktorat-jenderal-ebtke/selain-sidrap-berikut-pembangkit-listrik-tenaga-angin-yang-ditargetkan-segera-beroperasi-1. {{cite web}}: Missing or empty |title= (help)
  4. (PDF) https://reinvestindonesia.com/assets/source/materials/china-2022/Bapak_Ifnaldi_Sikumbang.pdf. {{cite web}}: Missing or empty |title= (help)
  5. https://investsrilanka.com/pooneryn-wind-solar-hybrid-energy-park-2/. {{cite web}}: Missing or empty |title= (help)