Tanahu hydroelectric plant

From Global Energy Monitor
Part of the
Global Hydropower Tracker,
a Global Energy Monitor project.
Report an error

Tanahu hydroelectric plant is a hydroelectric power plant under construction in Bhanu Municipality, Tanahun District, Gandaki Zone, Gandaki Province, Nepal.

Project Details

Table 1: Project details for Tanahu hydroelectric plant

Status Nameplate capacity Turbines Technology type Owner Operator
Construction[1] 140 MW[2] 2[3] Conventional storage[2] Nepal Electricity Authority (NEA)[4] Tanahu Hydropower LTD (THL)[4]

Location

Table 2: Location details for Tanahu hydroelectric plant

Location River Coordinates (WGS 84)
Bhanu Municipality, Tanahun District, Gandaki Zone, Gandaki Province, Nepal[4] Seti River[5] 28.4086, 83.9767 (approximate)[6]

The map below shows the approximate location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. https://web.archive.org/web/20221203151618/https://www.spotlightnepal.com/2021/12/12/tanahu-hydro-power-making-progress/. Archived from the original on 03 December 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20221225113951/http://www.adb.org/projects/43281-013/main. Archived from the original on 25 December 2022. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20230120185233/http://thl.com.np/. Archived from the original on 20 January 2023. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 https://web.archive.org/web/20211028170459/https://www.hydroreview.com/world-regions/project-spotlight-140-mw-tanahu-hydropower-facility/. Archived from the original on 28 October 2021. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20220107035025/https://myrepublica.nagariknetwork.com/news/140-mw-tanahu-hydropower-project-sees-25-percent-work-progress/. Archived from the original on 07 January 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  6. https://web.archive.org/web/20221022054009/http://www.doed.gov.np/license/66. Archived from the original on 22 October 2022. {{cite web}}: Missing or empty |title= (help)