Tauhara geothermal power plant
From Global Energy Monitor
This article is part of the Global Geothermal Power Tracker, a Global Energy Monitor project. |
Tauhara geothermal power plant is a geothermal power plant under construction in Taupō District, Waikato, New Zealand.
Project Details
Table 1: Unit-level project details for Tauhara geothermal power plant
Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
Construction[1] | 2024[1] | 152 MW[2] | Unknown type | Contact Energy LTD [100%][1] | Contact Energy LTD[1] |
Location
Table 2: Unit-level location details for Tauhara geothermal power plant
Location | Coordinates (WGS 84) |
---|---|
Taupō District, Waikato, New Zealand | -38.6667, 176.1567 (exact) |
The map below shows the exact location of the geothermal power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global geothermal power plants, a downloadable dataset, and summary data, please visit the Global Geothermal Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 https://web.archive.org/web/20221026012629/http://contact.co.nz/aboutus/our-story/our-projects/tauhara. Archived from the original on 26 October 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.thinkgeoenergy.com/tauhara-nz-geothermal-power-station-targets-operations-by-q3-2024/.
{{cite web}}
: Missing or empty|title=
(help)