Tehran-Tabriz Crude Oil Pipeline
From Global Energy Monitor
Part of the Global Oil Infrastructure Tracker, a Global Energy Monitor project. |
Related categories: |
Tehran-Tabriz Crude Oil Pipeline is an operating crude oil pipeline in Iran.[1] Two pipelines exist along the route — an original 1st Section and a more recent 2nd Section.
Location
The pipeline starts at the Tehran Refinery and runs to the Tabriz Refinery, Iran.[1]
Project details
1st Section
- Operator:
- Owner: National Iranian Oil Refining & Distribution Company (NIORDC)[2]
- Parent company: Iran Ministry of Petroleum
- Capacity:
- Length: 250 kilometers
- Diameter: 14 inches[2]
- Status: Operating[2]
- Start year:
- Financing:
- Associated projects:
2nd Section
- Operator:
- Owner: National Iranian Oil Refining and Distribution Company (NIORDC)[1]
- Parent company: Iran Ministry of Petroleum
- Capacity: 110,000 bpd[2]
- Length: 250 kilometers[2][3]
- Diameter: 16 inches[2]
- Status: Operating[2]
- Start year:
- Financing:
- Associated projects:
Background
The 2nd Section is 16 inches and is located parallel to the existing 14-inch Tehran-Tabriz Crude Oil Pipeline 1st Section, with 5 meters clearance. The pipeline routes pass through Idaloo Pumping Station and Qarachaman Pumping Station.[2]
Articles and resources
References
- ↑ 1.0 1.1 1.2 Kazemi, A. (January 2017). "National Iranian Oil Refining & Distribution Company (NIORDC)" (PDF). Retrieved 2020-08-05.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 "Tehran-Tabriz Crude Oil Pipeline 2nd section". www.bncnetwork.net. Retrieved 2022-05-09.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "زیر اساس - 16" Crude Oil Pipeline (2nd section)Tehran/Tabriz". www.zirasas.com. Retrieved 2022-05-09.