Tekerhat-Faridpur and Tekerhat-Barishal Gas Transmission Pipeline Project
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Tekerhat-Faridpur and Tekerhat-Barishal Gas Transmission Pipeline Project was a proposed gas pipeline in Bangladesh, which is now considered shelved.[1]
Location
The pipeline would run from Tekerhat to Faridpur on one side and Barishal on the other side[2]
Project Details
- Operator: Gas Transmission Company Limited (GTCL) [1]
- Owner: Gas Transmission Company Limited (GTCL) [1]
- Parent company: Petrobangla[3]
- Capacity:
- Length: 115 km / 71.46 miles [1]
- Diameter: 30 inches[1]
- Status: Shleved[2][1][3][4]
- Start year: 2029[5]
- Cost:
- Financing:
- Associated infrastructure:
Background
The pipeline project was expected to start in July 2025 and would be completed by June 2028.[1] As of 2024, the pipeline was not shown in the planned projects. [6]
Articles and resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 "Existing Pipeline". GTCL. Retrieved 2021-08-24.
- ↑ 2.0 2.1 Annual Report 2019 (PDF). PETROBANGLA. 2020. p. 47.
- ↑ 3.0 3.1 "Annual Report 2021" (PDF). Petrobangla.
{{cite web}}
: CS1 maint: url-status (link) - ↑ https://gtcl.portal.gov.bd/sites/default/files/files/gtcl.portal.gov.bd/monthly_report/f77ce396_ccee_46c8_8157_c0667c8ea4c1/2024-03-24-06-39-34a3686bc6eb7675953326a048feb1f8.pdf
- ↑ "Future Projects". GTCL.
{{cite web}}
: CS1 maint: url-status (link) - ↑ https://gtcl.portal.gov.bd/sites/default/files/files/gtcl.portal.gov.bd/monthly_report/f77ce396_ccee_46c8_8157_c0667c8ea4c1/2024-03-24-06-39-34a3686bc6eb7675953326a048feb1f8.pdf