Tekerhat-Faridpur and Tekerhat-Barishal Gas Transmission Pipeline Project was a proposed gas pipeline in Bangladesh, which is now considered shelved.[1]

Location

The pipeline would run from Tekerhat to Faridpur on one side and Barishal on the other side[2]

Loading map...

Project Details

  • Operator: Gas Transmission Company Limited (GTCL) [1]
  • Owner: Gas Transmission Company Limited (GTCL) [1]
  • Parent company: Petrobangla[3]
  • Capacity:
  • Length: 115 km / 71.46 miles [1]
  • Diameter: 30 inches[1]
  • Status: Shleved[2][1][3][4]
  • Start year: 2029[5]
  • Cost:
  • Financing:
  • Associated infrastructure:

Background

The pipeline project was expected to start in July 2025 and would be completed by June 2028.[1] As of 2024, the pipeline was not shown in the planned projects. [6]

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 "Existing Pipeline". GTCL. Retrieved 2021-08-24.
  2. 2.0 2.1 Annual Report 2019 (PDF). PETROBANGLA. 2020. p. 47.
  3. 3.0 3.1 "Annual Report 2021" (PDF). Petrobangla.{{cite web}}: CS1 maint: url-status (link)
  4. https://gtcl.portal.gov.bd/sites/default/files/files/gtcl.portal.gov.bd/monthly_report/f77ce396_ccee_46c8_8157_c0667c8ea4c1/2024-03-24-06-39-34a3686bc6eb7675953326a048feb1f8.pdf
  5. "Future Projects". GTCL.{{cite web}}: CS1 maint: url-status (link)
  6. https://gtcl.portal.gov.bd/sites/default/files/files/gtcl.portal.gov.bd/monthly_report/f77ce396_ccee_46c8_8157_c0667c8ea4c1/2024-03-24-06-39-34a3686bc6eb7675953326a048feb1f8.pdf

Related SourceWatch articles

External resources

External articles