Tengiz-Kulsary Gas Pipeline
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Tengiz-Kulsary Gas Pipeline (Russian: Газопровод "Тенгиз-Кульсары") is an operating gas pipeline in Kazakhstan.[1]
Location
The pipeline runs from the Tengiz Oil and Gas field, Atyrau region, to Kulsary, Atyrau region, Kazakhstan.[1]
Project details
- Operator: Intergas Central Asia[2]
- Owner: Qazaqgaz[2]
- Parent company: Samruk-Kazyna SWF JSC[3]
- Capacity: 0.83 bcm/y[4]
- Length: 126 km[1]
- Diameter: 1200 mm[4]
- Status: Operating[1][5]
- Start year:
- Cost:
- Financing:
- Associated infrastructure: Tengiz Oil and Gas Field, Central Asia-Center Gas Pipeline
Background
The pipeline connects to the Central Asia-Center Gas Pipeline at the Kulsary Compressor Station.[5]
Articles and resources
References
- ↑ 1.0 1.1 1.2 1.3 "О компании". www.zhylyoigas.kz. Retrieved August 20, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 2.0 2.1 "About the company". Intergas Central Asia. Retrieved 2022-07-19.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "National company QazaqGaz JSC (KZTG) - Kazakhstan Stock Exchange (KASE)". kase.kz (in русский). Retrieved 2022-07-19.
- ↑ 4.0 4.1 "Информация ТОО "Жылыойгаз"" (PDF). www.zhylyoigas.kz. 2019. Retrieved August 20, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 5.0 5.1 "Intergas Central Asia". ICA. 2024. Retrieved August 20, 2024.
{{cite web}}
: CS1 maint: url-status (link)
*add as many countries as the pipeline passes through