Terrer (Lightsource BP) solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Terrer (Lightsource BP) solar farm (Instalación fotovoltaica Terrer Solar) is a solar photovoltaic (PV) farm in pre-construction in Terrer, Zaragoza, Aragón, Spain.
Project Details
Table 1: Phase-level project details for Terrer (Lightsource BP) solar farm
Status | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|
Pre-construction[1] | 107 MWac[2] | PV[3] | Lightsource BP [100%][4] | Jorge Energy I[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Terrer (Lightsource BP) solar farm
Location | Coordinates (WGS 84) |
---|---|
Terrer, Zaragoza, Aragón, Spain[5] | 41.3385, -1.7569 (approximate)[5] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ https://lightsourcebp.com/es/news/el-proyecto-terrer-consigue-la-dia/, https://lightsourcebp.com/project/solar-terrer/ https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2435, https://lightsourcebp.com/es/news/el-proyecto-terrer-consigue-la-dia/, https://lightsourcebp.com/project/solar-terrer/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 2.0 2.1 "BOE-A-2023-2435 Resolución de 17 de enero de 2023, de la Dirección General de Política Energética y Minas, por la que se otorga a Jorge Energy I, SL, la autorización administrativa de construcción, para la instalación fotovoltaica Terrer Solar de 130 MW de potencia pico". Boletín Oficial del Estado. 2023-01-30. Archived from the original on 2024-02-19. Retrieved 2024-01-30.
- ↑ https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2435 https://lightsourcebp.com/project/solar-terrer/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2435.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ https://www.bp.com/content/dam/bp/business-sites/en/global/corporate/pdfs/investors/statements/bp-international-limited-2022.pdf, https://lightsourcebp.com/project/solar-terrer/ https://www.elperiodicodearagon.com/aragon/2021/06/18/bp-compra-grupo-jorge-tres-53853874.html, https://www.bp.com/content/dam/bp/business-sites/en/global/corporate/pdfs/investors/statements/bp-international-limited-2022.pdf, https://lightsourcebp.com/project/solar-terrer/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 5.0 5.1 "Proyecto solar Terrer". Lightsource bp. 2022-12-08. Archived from the original on 2024-02-07.