Terrer (Lightsource BP) solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Terrer (Lightsource BP) solar farm (Instalación fotovoltaica Terrer Solar) is a solar photovoltaic (PV) farm in pre-construction in Terrer, Zaragoza, Aragón, Spain.

Project Details

Table 1: Phase-level project details for Terrer (Lightsource BP) solar farm

Status Nameplate capacity Technology Owner Operator
Pre-construction[1] 107 MWac[2] PV[3] Lightsource BP [100%][4] Jorge Energy I[2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Terrer (Lightsource BP) solar farm

Location Coordinates (WGS 84)
Terrer, Zaragoza, Aragón, Spain[5] 41.3385, -1.7569 (approximate)[5]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. https://lightsourcebp.com/es/news/el-proyecto-terrer-consigue-la-dia/, https://lightsourcebp.com/project/solar-terrer/ https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2435, https://lightsourcebp.com/es/news/el-proyecto-terrer-consigue-la-dia/, https://lightsourcebp.com/project/solar-terrer/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. 2.0 2.1 "BOE-A-2023-2435 Resolución de 17 de enero de 2023, de la Dirección General de Política Energética y Minas, por la que se otorga a Jorge Energy I, SL, la autorización administrativa de construcción, para la instalación fotovoltaica Terrer Solar de 130 MW de potencia pico". Boletín Oficial del Estado. 2023-01-30. Archived from the original on 2024-02-19. Retrieved 2024-01-30.
  3. https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2435 https://lightsourcebp.com/project/solar-terrer/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2435. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  4. https://www.bp.com/content/dam/bp/business-sites/en/global/corporate/pdfs/investors/statements/bp-international-limited-2022.pdf, https://lightsourcebp.com/project/solar-terrer/ https://www.elperiodicodearagon.com/aragon/2021/06/18/bp-compra-grupo-jorge-tres-53853874.html, https://www.bp.com/content/dam/bp/business-sites/en/global/corporate/pdfs/investors/statements/bp-international-limited-2022.pdf, https://lightsourcebp.com/project/solar-terrer/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  5. 5.0 5.1 "Proyecto solar Terrer". Lightsource bp. 2022-12-08. Archived from the original on 2024-02-07.