Thanh Hải No. 5 Offshore wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Ben Tre 5 Thanh Hai 3+4 (intertidal) Offshore wind farm (Phases 3, 4)

Thanh Hải No. 5 Offshore wind farm (Số 5 Thạnh Hải 2, Số 5 - Thạnh Hải 3+4) is an operating wind farm in Thạnh Hải, Thạnh Phú, Bến Tre Province, Vietnam.

Project Details

Table 1: Phase-level project details for Thanh Hải No. 5 Offshore wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Operating[1] 2021[1] 32 MW[2] Offshore hard mount[2] Vietnam Electricity (EVN) [100%][3] Tân Hoàn Cầu Group; Siemens Gamesa Renewable Energy SA (Siemens Gamesa Renewable Energy Siemens Gamesa Ανανεωσιμη Ενεργεια Ανωμυμη Εταιρεια)[2][2]
2 Operating[3] 2022[3] 32 MW[3] Offshore hard mount[3] Vietnam Electricity (EVN) [100%][3]
3 Operating[4] 2022[4] 30 MW[5] Offshore hard mount[4] Vietnam Electricity (EVN) [100%][4]
4 Operating[4] 2022[4] 33 MW[4] Offshore hard mount[4] Vietnam Electricity (EVN) [100%][4]

Location

Table 2: Phase-level location details for Thanh Hải No. 5 Offshore wind farm

Phase Name Location Coordinates (WGS 84)
1 Thạnh Hải, Thạnh Phú, Bến Tre Province, Vietnam[6] 9.915, 106.6806 (approximate)[6]
2 Vietnam[7] 9.915, 106.6806 (exact)[7]
3 Thạnh Hải, Thạnh Phú, Bến Tre Province, Vietnam[6] 9.915, 106.6806 (approximate)[6]
4 Thạnh Hải, Thạnh Phú, Bến Tre Province, Vietnam[6] 9.915, 106.6806 (approximate)[6]

The map below shows the locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://web.archive.org/web/20240126090208/https://www.4coffshore.com/windfarms/vietnam/ben-tre-5-thanh-hai-1%28intertidal%29-vietnam-vn32.html. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 https://web.archive.org/web/20240125201544/https://www.siemensgamesa.com/en-int/newsroom/2019/07/190722-siemens-gamesa-nearshore-project-vietnam. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 https://web.archive.org/web/20240125201605/https://www.4coffshore.com/windfarms/vietnam/ben-tre-5-thanh-hai-2%28intertidal%29-vietnam-vn84.html. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 https://web.archive.org/web/20240125203434/https://www.4coffshore.com/windfarms/vietnam/ben-tre-5-thanh-hai-32b4%28intertidal%29-vietnam-vn98.html. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20240125203320/https://en.evn.com.vn/d6/news/Updated-information-on-the-submission-of-application-for-accepting-commercial-operationCOD-for-wind-power-plants-as-of-3-August-2021-66-142-2432.aspx. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 6.4 6.5 https://web.archive.org/web/20240131193734/https://thailand-construction.com/siemens-gamesa-signs-wind-turbine-order-for-vietnams-thanh-hai-1-wind-farm/. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 (PDF) https://web.archive.org/web/20240131193731/https://ekf.dk/media/qxhldcur/thanh-hai-2-wind-project-esia_rev00.pdf. Archived from the original (PDF) on 31 January 2024. {{cite web}}: Missing or empty |title= (help)