Thi Vai Import Terminal Gas Pipeline

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

The Thi Vai Import Terminal Gas Pipeline is an under construction natural gas pipeline in Vietnam.[1]

Location

The pipeline would run from the Thi Vai LNG Terminal to the existing gas distribution centre.[1][2]

Loading map...

Project Details

  • Operator: PetroVietnam (PV Gas)[3]
  • Owner: PetroVietnam (PV Gas)[4]
  • Parent company: PetroVietnam (PV Gas)[5]
  • Capacity: 4.5 billion cubic meters per year[1]
  • Length: 12 kilometers[1]
  • Diameter: 18 inches[1]
  • Status: Operating[1][6][7]
  • Start year: 2023[7]
  • Cost:
  • Financing:
  • Associated infrastructure:

Background

In July 2023, Thi Vai LNG Terminal received its first LNG shipment. [7][8][9]

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 Vietnam LNG Sector Update, Allens, accessed December 2, 2020
  2. https://www.allens.com.au/globalassets/pdfs/insights/asia/allens-vietnam-lng-sector-update.pdf
  3. Yep, Eric; Vietnam, Newsdesk (2019-09-19). "Vietnam to start construction of Thi Vai LNG terminal in October". www.spglobal.com. Retrieved 2021-10-28.
  4. Yep, Eric; Vietnam, Newsdesk (2019-09-19). "Vietnam to start construction of Thi Vai LNG terminal in October". www.spglobal.com. Retrieved 2021-10-28.
  5. Yep, Eric; Vietnam, Newsdesk (2019-09-19). "Vietnam to start construction of Thi Vai LNG terminal in October". www.spglobal.com. Retrieved 2021-10-28.
  6. Sanja Pekic (2021-11-15). "Vietnam's Thi Vai LNG facility almost completed". Offshore Energy. Retrieved 2022-08-04.
  7. 7.0 7.1 7.2 "PV GAS received first LNG cargo at THI VAI LNG terminal". PVGAS. Retrieved 2023-08-24.
  8. https://www.offshore-energy.biz/vietnams-thi-vai-terminal-welcomes-first-lng-shipment/
  9. "PV GAS COMPLETED FIRST LNG IMPORT CARGO RECEPTION". PVGAS. Retrieved 2023-08-24.

Related GEM.wiki articles

External resources

External articles