Tianchi Changji cogen power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Tianchi Changji cogen power station (天池能源昌吉热电) is an operating power station of at least 700-megawatts (MW) in Erliugong Town, Zhundong, Changji, Xinjiang, China with multiple units, some of which are not currently operating. It is also known as 天池能源昌吉州准东火电机组项目 (Unit 3 & 4), 特变电工新疆天池能源五彩湾2×660兆瓦项目 (Unit 3 & 4), 新疆准能投资有限公司准东2×660MW火电项目 (Unit 3 & 4), 新疆准东五彩湾2×660MW火电项目 (Unit 3 & 4).
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Tianchi Changji cogen power station | Erliugong Town, Zhundong, Changji, Xinjiang, China | 44.004362, 87.171961 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2, Unit 3, Unit 4: 44.004362, 87.171961
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Unit 1 | operating | coal: unknown | 350 | supercritical | 2017 |
Unit 2 | operating | coal: unknown | 350 | supercritical | 2017 |
Unit 3 | construction | coal: unknown | 660 | ultra-supercritical | 2026 (planned) |
Unit 4 | construction | coal: unknown | 660 | ultra-supercritical | 2026 (planned) |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 1 | Xinjiang Tianchi Energy Co Ltd [100%] | TBEA Co Ltd [85.8%]; Xinjiang Joinworld Co Ltd [14.2%] |
Unit 2 | Xinjiang Tianchi Energy Co Ltd [100%] | TBEA Co Ltd [85.8%]; Xinjiang Joinworld Co Ltd [14.2%] |
Unit 3 | Xinjiang Tianchi Energy Co Ltd [100%] | TBEA Co Ltd [85.8%]; Xinjiang Joinworld Co Ltd [14.2%] |
Unit 4 | Xinjiang Tianchi Energy Co Ltd [100%] | TBEA Co Ltd [85.8%]; Xinjiang Joinworld Co Ltd [14.2%] |
Project-level coal details
- Permit(s):
Background
Tianchi Changji cogen power station is a 2 x 350 supercritical coal plant in Changji Hui AP, Xinjiang province. It was permitted in September 2014,[1] and construction began in 2015. Operation is planned for 2017.[2]
Unit 1 began operating in March 2017.[3] Commissioning of unit 2 began in June 2017.[4]
Expansion proposed
In July 2022, it was reported to that according to province's "14th Five-Year Plan" from April 2022, an additional 2 x 660 MW was under consideration.[5] By August 2022, a consortium was awarded a bid to build, operate, and maintain the units.[6]
Articles and Resources
References
- ↑ "关于新疆天池能源有限责任公司昌吉2×350MW热电联产工程环境影响报告书的批复," China MEP, September 16, 2014
- ↑ "天池能源昌吉热电获自治区核准," Xinjiang province, 2015-05-18
- ↑ "新疆昌吉热电厂2×35万千瓦超临界燃煤发电机组1号机组通过168," 北极星电力网新闻中心, March 22, 2017
- ↑ "天池能源昌吉项目2号机组并网一次成功," Hubei Hongyuan Power Engineering, June 23, 2017
- ↑ "昌吉州准东2×66万千瓦火电机组项目招标公告," BJX, 2022-07-20
- ↑ "今日消息 特变电工:联合体中标49.79亿元昌吉州准东2×66万千瓦火电机组项目," t-d, 2022-08-14